Well Details

Well ID: 0205030116020
Loading map...
Location: 02/16-01-020-03W5/0
Location Alias: 02/16-01-20-03 W5M
Location Alias 2: 02/16-01-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 01
County/Municipality: Turner Valley
Well Name: CPEC MCLEOD 2 TV 16-1-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0012000
License Date: 1956-08-28
License Status: Abandoned
Spud Date: 1925-06-19
Final Drill Date: 1927-05-06
Well Total Depth: 1347.20 m
Surface Hole Latitude: 50.673255
Surface Hole Longitude: -114.279882

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1927-03-01 Production Casing Operation Performed
1927-05-06 Finished Drilling
1927-05-06 Perforation Treatment Performed - Open-Hole Completion
1927-05-06 Well Mode changed to Drilled and Cased
1927-05-07 Well Began Production
1927-05-07 Well Fluid changed to Gas
1927-05-07 Well Mode changed to Flowing
1929-06-05 Perforation Treatment Performed - Open-Hole Completion
1956-08-28 Obtained License
2018-05-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-03 Perforation Treatment Performed - Cement Squeeze
2018-05-03 Plug Back Performed
2018-05-03 Well Fluid changed to Gas
2018-05-03 Well Mode changed to Abandoned Zone
2018-05-04 Perforation Treatment Performed - Jet Perforation
2018-05-07 Perforation Treatment Performed - Jet Perforation
2018-05-08 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-08 Perforation Treatment Performed - Remedial Casing
2018-05-08 Plug Back Performed
2018-05-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-09 Plug Back Performed
2018-05-10 Perforation Treatment Performed - Jet Perforation
2018-05-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-11 Perforation Treatment Performed - Remedial Casing
2018-05-11 Plug Back Performed
2018-05-14 Perforation Treatment Performed - Jet Perforation
2018-05-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-15 Perforation Treatment Performed - Remedial Casing
2018-05-15 Plug Back Performed
2018-05-16 Perforation Treatment Performed - Jet Perforation
2018-05-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-17 Perforation Treatment Performed - Remedial Casing
2018-05-17 Plug Back Performed
2018-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-18 Perforation Treatment Performed - Jet Perforation
2018-05-18 Perforation Treatment Performed - Remedial Casing
2018-05-18 Plug Back Performed
2018-05-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2018-05-22 Perforation Treatment Performed - Jet Perforation
2018-05-22 Perforation Treatment Performed - Remedial Casing
2018-05-22 Plug Back Performed
2019-03-04 Well Abandoned
2019-03-04 Well Fluid changed to Gas
2019-03-04 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1927-05-06 Open Hole/Barefoot Completion 1106.70 1328.90 0
2018-05-08 Remedial Casing Cementing 921.00 922.00 0
2018-05-08 Packing Device Capped w/Cement 949.00 1010.00 0
2018-05-09 Packing Device Capped w/Cement 887.00 917.00 0
2018-05-10 Perforation 671.00 672.00 17
2018-05-10 Perforation 595.00 596.00 17
2018-05-11 Remedial Casing Cementing 595.00 596.00 0
2018-05-11 Packing Device Capped w/Cement 549.80 602.00 0
2018-05-14 Perforation 462.00 463.00 17
2018-05-15 Remedial Casing Cementing 462.00 463.00 0
2018-05-15 Packing Device Capped w/Cement 439.00 460.00 0
1929-06-05 Open Hole/Barefoot Completion 1106.70 1347.20 0
2018-05-16 Perforation 286.00 287.00 17
2018-05-16 Perforation 203.00 204.00 17
2018-05-17 Remedial Casing Cementing 203.00 204.00 0
2018-05-17 Packing Device Capped w/Cement 160.80 209.00 0
2018-05-18 Perforation 108.00 109.00 17
2018-05-18 Remedial Casing Cementing 108.00 109.00 0
2018-05-18 Packing Device Capped w/Cement 95.40 107.00 0
2018-05-22 Perforation 89.00 90.00 17
2018-05-22 Remedial Casing Cementing 89.00 90.00 0
2018-05-22 Packing Device Capped w/Cement 72.00 87.00 0
2018-05-03 Cement Squeeze 1106.70 1347.20 0
2018-05-03 Packing Device Capped w/Cement 1066.10 1084.00 0
2018-05-04 Perforation 1022.00 1023.00 17
2018-05-04 Perforation 921.00 922.00 17
2018-05-07 Perforation 1012.00 1013.00 17
2018-05-08 Remedial Casing Cementing 1022.00 1023.00 0
2018-05-08 Remedial Casing Cementing 1012.00 1013.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 8027 0.0 0.0 0.0
1985 5407 0.0 0.0 0.0
1986 7070 0.0 0.0 0.0
1987 8201 0.0 0.0 0.0
1988 8271 0.0 0.0 0.0
1989 8262 0.0 0.0 0.0
1990 8332 0.0 0.0 0.0
1991 8020 0.0 0.0 0.0
1992 7857 0.0 0.0 0.0
1993 8219 0.0 0.0 0.0
1994 8586 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8645 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8224 0.0 0.0 0.0
1999 6461 0.0 0.0 0.0
2000 8777 0.0 0.0 0.0
2001 5971 0.0 0.0 0.0
2002 8396 0.0 0.0 0.0
2003 8365 0.0 0.0 0.0
2004 7982 0.0 0.0 0.0
2005 7071 0.0 0.0 0.0
2006 8507 0.0 0.0 0.0
2007 4977 0.0 0.0 0.0
2008 4934 0.0 0.0 0.0
2009 7437 0.0 0.0 0.0
2010 7163 0.0 0.0 0.0
2011 7338 0.0 0.0 0.0
2012 8515 0.0 0.0 0.0
2013 7425 0.0 0.0 0.0
2014 7068 0.0 0.0 0.0
2015 8352 0.0 0.0 0.0
2016 6740 0.0 0.0 0.0
2017 7710 0.0 0.0 0.0
2018 2552 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-05-31 No Incident Encountered 0.00 0.00

For data sources see[6]