If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205030109040 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.669024,"lon":-114.279871,"icon":""}]} |
Location: 04/09-01-020-03W5/0 | |
Location Alias: 04/09-01-20-03 W5M | |
Location Alias 2: 04/09-01-020-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Turner Valley | |
Well Name: CPEC MIDFIELD 104 TV 9-1-20-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0012003 | |
License Date: 1956-08-27 | |
License Status: Issued | |
Spud Date: 1929-03-15 | |
Final Drill Date: 1930-09-28 | |
Well Total Depth: 1297.80 m | |
Surface Hole Latitude: 50.669024 | |
Surface Hole Longitude: -114.279871 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1929-03-22 | Conductor Casing Operation Performed |
1929-05-01 | Surface Casing Operation Performed |
1929-06-12 | Intermediate Casing Operation Performed |
1929-08-24 | Intermediate Casing Operation Performed |
1930-06-12 | Intermediate Casing Operation Performed |
1930-06-25 | Production Casing Operation Performed |
1930-09-28 | Finished Drilling |
1930-09-28 | Perforation Treatment Performed - Open-Hole Completion |
1930-09-28 | Well Mode changed to Drilled and Cased |
1930-09-30 | Well Began Production |
1930-09-30 | Well Fluid changed to Gas |
1930-09-30 | Well Mode changed to Flowing |
1933-11-21 | Perforation Treatment Performed - Open-Hole Completion |
1956-08-27 | Obtained License |
2019-03-01 | Well Fluid changed to Gas |
2019-03-01 | Well Mode changed to Suspended |
2019-03-08 | Well Log Performed |
2019-03-11 | Well Log Performed |
2019-03-12 | Perforation Treatment Performed - Cement Squeeze |
2019-03-13 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-13 | Perforation Treatment Performed - Jet Perforation |
2019-03-13 | Plug Back Performed |
2019-03-13 | Well Fluid changed to Gas |
2019-03-13 | Well Log Performed |
2019-03-13 | Well Mode changed to Abandoned Zone |
2019-03-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-14 | Perforation Treatment Performed - Remedial Casing |
2019-03-14 | Plug Back Performed |
2019-03-15 | Perforation Treatment Performed - Remedial Casing |
2019-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-18 | Perforation Treatment Performed - Jet Perforation |
2019-03-18 | Perforation Treatment Performed - Remedial Casing |
2019-03-18 | Plug Back Performed |
2019-03-18 | Well Log Performed |
2019-03-19 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-19 | Perforation Treatment Performed - Jet Perforation |
2019-03-19 | Plug Back Performed |
2019-03-19 | Well Log Performed |
2019-03-20 | Perforation Treatment Performed - Remedial Casing |
2019-03-21 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-21 | Perforation Treatment Performed - Jet Perforation |
2019-03-21 | Plug Back Performed |
2019-03-21 | Well Log Performed |
2019-03-22 | Perforation Treatment Performed - Remedial Casing |
2019-03-25 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-25 | Plug Back Performed |
2019-03-26 | Perforation Treatment Performed - Jet Perforation |
2019-03-26 | Well Log Performed |
2019-03-27 | Perforation Treatment Performed - Remedial Casing |
2019-03-28 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-28 | Perforation Treatment Performed - Jet Perforation |
2019-03-28 | Plug Back Performed |
2019-03-28 | Well Log Performed |
2019-03-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-03-29 | Perforation Treatment Performed - Remedial Casing |
2019-03-29 | Plug Back Performed |
2019-04-01 | Perforation Treatment Performed - Jet Perforation |
2019-04-01 | Perforation Treatment Performed - Remedial Casing |
2019-04-01 | Well Log Performed |
2019-04-02 | Well Log Performed |
2019-04-03 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-04-03 | Perforation Treatment Performed - Jet Perforation |
2019-04-03 | Perforation Treatment Performed - Remedial Casing |
2019-04-03 | Plug Back Performed |
2019-04-03 | Well Log Performed |
2019-04-04 | Perforation Treatment Performed - Jet Perforation |
2019-04-04 | Perforation Treatment Performed - Remedial Casing |
2019-04-04 | Well Log Performed |
2019-04-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-04-05 | Perforation Treatment Performed - Jet Perforation |
2019-04-05 | Perforation Treatment Performed - Remedial Casing |
2019-04-05 | Plug Back Performed |
2019-04-05 | Well Log Performed |
2019-04-08 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-04-08 | Perforation Treatment Performed - Jet Perforation |
2019-04-08 | Plug Back Performed |
2019-04-08 | Well Log Performed |
2019-04-10 | Perforation Treatment Performed - Remedial Casing |
2019-04-11 | Well Log Performed |
2019-05-24 | Well Log Performed |
2019-07-15 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-07-15 | Perforation Treatment Performed - Jet Perforation |
2019-07-15 | Plug Back Performed |
2019-07-15 | Well Log Performed |
2019-07-17 | Perforation Treatment Performed - Remedial Casing |
2019-07-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2019-07-18 | Plug Back Performed |
2019-07-18 | Well Log Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1930-09-28 | Open Hole/Barefoot Completion | 1198.80 | 1281.70 | 0 |
2019-03-18 | Packing Device Capped w/Cement | 1063.00 | 1081.00 | 0 |
2019-03-18 | Perforation | 1014.00 | 1015.00 | 20 |
2019-03-18 | Remedial Casing Cementing | 1014.00 | 1015.00 | 0 |
2019-03-19 | Packing Device Capped w/Cement | 994.50 | 1010.00 | 0 |
2019-03-19 | Perforation | 862.00 | 863.00 | 13 |
2019-03-20 | Remedial Casing Cementing | 862.00 | 863.00 | 0 |
2019-03-21 | Packing Device Capped w/Cement | 843.50 | 859.00 | 0 |
2019-03-21 | Perforation | 789.00 | 790.00 | 13 |
2019-03-21 | Perforation | 710.00 | 711.00 | 13 |
2019-03-22 | Remedial Casing Cementing | 789.00 | 790.00 | 0 |
1933-11-21 | Open Hole/Barefoot Completion | 1198.80 | 1297.30 | 0 |
2019-03-22 | Remedial Casing Cementing | 710.00 | 711.00 | 0 |
2019-03-25 | Packing Device Capped w/Cement | 675.00 | 786.00 | 0 |
2019-03-26 | Perforation | 600.00 | 601.00 | 13 |
2019-03-26 | Perforation | 605.00 | 606.00 | 13 |
2019-03-27 | Remedial Casing Cementing | 605.00 | 606.00 | 0 |
2019-03-27 | Remedial Casing Cementing | 600.00 | 601.00 | 0 |
2019-03-28 | Packing Device Capped w/Cement | 580.00 | 597.00 | 0 |
2019-03-28 | Perforation | 430.00 | 431.00 | 13 |
2019-03-29 | Remedial Casing Cementing | 430.00 | 431.00 | 0 |
2019-03-29 | Packing Device Capped w/Cement | 420.00 | 428.00 | 0 |
2019-03-12 | Cement Squeeze | 1198.80 | 1297.30 | 0 |
2019-04-01 | Perforation | 424.00 | 425.00 | 13 |
2019-04-01 | Remedial Casing Cementing | 424.00 | 425.00 | 0 |
2019-04-03 | Packing Device Capped w/Cement | 414.00 | 422.00 | 0 |
2019-04-03 | Perforation | 372.00 | 373.00 | 13 |
2019-04-03 | Remedial Casing Cementing | 372.00 | 373.00 | 0 |
2019-04-04 | Perforation | 366.00 | 367.00 | 13 |
2019-04-04 | Remedial Casing Cementing | 366.00 | 367.00 | 0 |
2019-04-05 | Packing Device Capped w/Cement | 349.50 | 369.00 | 0 |
2019-04-05 | Perforation | 276.00 | 277.00 | 13 |
2019-04-05 | Remedial Casing Cementing | 276.00 | 277.00 | 0 |
2019-03-13 | Packing Device Capped w/Cement | 1169.20 | 1185.00 | 0 |
2019-04-08 | Packing Device Capped w/Cement | 263.00 | 271.00 | 0 |
2019-04-08 | Perforation | 260.00 | 261.00 | 13 |
2019-04-08 | Perforation | 256.50 | 257.50 | 39 |
2019-04-10 | Remedial Casing Cementing | 256.50 | 261.00 | 0 |
2019-07-15 | Packing Device Capped w/Cement | 245.00 | 253.00 | 0 |
2019-07-15 | Perforation | 220.00 | 221.00 | 39 |
2019-07-17 | Remedial Casing Cementing | 220.00 | 221.00 | 0 |
2019-07-18 | Packing Device Capped w/Cement | 201.00 | 210.00 | 0 |
2019-03-13 | Perforation | 1130.00 | 1131.00 | 13 |
2019-03-13 | Perforation | 1085.00 | 1086.00 | 13 |
2019-03-14 | Remedial Casing Cementing | 1130.00 | 1131.00 | 0 |
2019-03-14 | Packing Device Capped w/Cement | 1106.00 | 1126.00 | 0 |
2019-03-15 | Remedial Casing Cementing | 1085.00 | 1086.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1961 | 0 | 0.0 | 0.0 | 0.0 |
1984 | 7337 | 0.0 | 0.0 | 0.0 |
1985 | 5407 | 0.0 | 0.0 | 0.0 |
1986 | 7239 | 0.0 | 0.0 | 0.0 |
1987 | 8043 | 0.0 | 0.0 | 0.0 |
1988 | 7835 | 0.0 | 0.0 | 0.0 |
1989 | 8297 | 0.0 | 0.0 | 0.0 |
1990 | 8441 | 0.0 | 0.0 | 0.0 |
1991 | 8036 | 0.0 | 0.0 | 0.0 |
1992 | 7988 | 0.0 | 0.0 | 0.0 |
1993 | 8542 | 0.0 | 0.0 | 0.0 |
1994 | 8266 | 0.0 | 0.0 | 0.0 |
1995 | 7655 | 0.0 | 0.0 | 0.0 |
1996 | 8717 | 0.0 | 0.0 | 0.0 |
1997 | 8748 | 0.0 | 0.0 | 0.0 |
1998 | 8224 | 0.0 | 0.0 | 0.0 |
1999 | 8621 | 0.0 | 0.0 | 0.0 |
2000 | 8777 | 0.0 | 0.0 | 0.0 |
2001 | 7917 | 0.0 | 0.0 | 0.0 |
2002 | 8655 | 0.0 | 0.0 | 0.0 |
2003 | 8317 | 0.0 | 0.0 | 0.0 |
2004 | 7982 | 0.0 | 0.0 | 0.0 |
2005 | 7071 | 0.0 | 0.0 | 0.0 |
2006 | 8507 | 0.0 | 0.0 | 0.0 |
2007 | 4872 | 0.0 | 0.0 | 0.0 |
2008 | 4502 | 0.0 | 0.0 | 0.0 |
2009 | 7659 | 0.0 | 0.0 | 0.0 |
2010 | 7174 | 0.0 | 0.0 | 0.0 |
2011 | 7524 | 0.0 | 0.0 | 0.0 |
2012 | 8635 | 0.0 | 0.0 | 0.0 |
2013 | 7513 | 0.0 | 0.0 | 0.0 |
2014 | 7104 | 0.0 | 0.0 | 0.0 |
2015 | 8489 | 0.0 | 0.0 | 0.0 |
2016 | 7481 | 0.0 | 0.0 | 0.0 |
2017 | 7105 | 0.0 | 0.0 | 0.0 |
2018 | 8341 | 0.0 | 0.0 | 0.0 |
2019 | 1032 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2019-04-10 | No Incident Encountered | 0.00 | 0.00 |
2019-07-18 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]