X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205030108000

Well Details

Well ID: 0205030108000
Loading map...
Location: 00/08-01-020-03W5/0
Location Alias: 00/08-01-20-03 W5M
Location Alias 2: 00/08-01-020-03 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 03
Section: 01
County/Municipality: Turner Valley
Well Name: CPEC TV 8-1-20-3
Operator Name: Crescent Point Energy Corp.
License Number: 0012006
License Date: 1956-08-27
License Status: Issued
Spud Date: 1914-07-27
Final Drill Date: 1930-12-21
Well Total Depth: 1567.00 m
Surface Hole Latitude: 50.663692
Surface Hole Longitude: -114.279526

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1930-08-21 Production Casing Operation Performed
1930-12-21 Finished Drilling
1930-12-21 Perforation Treatment Performed - Open-Hole Completion
1930-12-21 Well Mode changed to Drilled and Cased
1931-01-21 Perforation Treatment Performed - Fractured
1931-06-16 Well Began Production
1931-06-16 Well Fluid changed to Gas
1931-06-16 Well Mode changed to Flowing
1956-08-27 Obtained License
2020-02-13 Perforation Treatment Performed - Cement Squeeze
2020-02-13 Plug Back Performed
2020-02-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-02-20 Perforation Treatment Performed - Jet Perforation
2020-02-20 Plug Back Performed
2020-02-20 Well Fluid changed to Gas
2020-02-20 Well Mode changed to Abandoned Zone
2020-02-24 Perforation Treatment Performed - Jet Perforation
2020-02-24 Perforation Treatment Performed - Remedial Casing
2020-02-25 Perforation Treatment Performed - Cement Plug
2020-02-25 Plug Back Performed
2020-02-26 Perforation Treatment Performed - Abrasa-Jet Perforation
2020-02-26 Perforation Treatment Performed - Remedial Casing
2020-02-27 Perforation Treatment Performed - Jet Perforation
2020-02-28 Perforation Treatment Performed - Cement Squeeze
2020-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-02 Perforation Treatment Performed - Jet Perforation
2020-03-02 Plug Back Performed
2020-03-04 Perforation Treatment Performed - Cement Squeeze
2020-03-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-05 Perforation Treatment Performed - Jet Perforation
2020-03-05 Plug Back Performed
2020-03-06 Perforation Treatment Performed - Cement Squeeze
2020-03-09 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-09 Perforation Treatment Performed - Jet Perforation
2020-03-09 Plug Back Performed
2020-03-10 Perforation Treatment Performed - Cement Squeeze
2020-03-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-11 Plug Back Performed
2020-03-12 Perforation Treatment Performed - Jet Perforation
2020-03-17 Perforation Treatment Performed - Cement Squeeze
2020-03-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-18 Plug Back Performed
2020-03-19 Perforation Treatment Performed - Jet Perforation
2020-03-20 Perforation Treatment Performed - Cement Squeeze
2020-03-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-23 Perforation Treatment Performed - Jet Perforation
2020-03-23 Plug Back Performed
2020-03-25 Perforation Treatment Performed - Cement Squeeze
2020-03-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2020-03-26 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1930-12-21 Open Hole/Barefoot Completion 1452.70 1567.00 0
2020-02-26 Hydra Jet Perforation 1148.00 1174.50 0
2020-02-26 Remedial Casing Cementing 1148.00 1174.50 0
2020-02-27 Perforation 959.00 960.00 13
2020-02-28 Cement Squeeze 959.00 960.00 0
2020-03-02 Packing Device Capped w/Cement 938.40 954.00 0
2020-03-02 Perforation 851.00 852.00 13
2020-03-04 Cement Squeeze 851.00 852.00 0
2020-03-05 Packing Device Capped w/Cement 836.10 848.00 0
2020-03-05 Perforation 698.00 699.00 13
2020-03-06 Cement Squeeze 698.00 699.00 0
1931-01-21 Fracture 1478.90 1567.00 0
2020-03-09 Packing Device Capped w/Cement 684.50 695.00 0
2020-03-09 Perforation 679.00 680.00 17
2020-03-10 Cement Squeeze 679.00 680.00 0
2020-03-11 Packing Device Capped w/Cement 663.60 675.00 0
2020-03-12 Perforation 570.00 571.00 17
2020-03-12 Perforation 560.00 561.00 17
2020-03-17 Cement Squeeze 560.00 571.00 0
2020-03-18 Packing Device Capped w/Cement 544.80 556.00 0
2020-03-19 Perforation 431.00 432.00 17
2020-03-20 Cement Squeeze 431.00 432.00 0
2020-02-13 Cement Squeeze 1452.70 1567.00 0
2020-03-23 Packing Device Capped w/Cement 416.00 427.00 0
2020-03-23 Perforation 324.00 325.00 17
2020-03-25 Cement Squeeze 324.00 325.00 0
2020-03-26 Packing Device Capped w/Cement 308.60 320.00 0
2020-02-20 Packing Device Capped w/Cement 1388.50 1446.60 0
2020-02-20 Perforation 1259.00 1260.00 13
2020-02-24 Perforation 1173.50 1174.50 13
2020-02-24 Remedial Casing Cementing 1259.00 1260.00 0
2020-02-24 Remedial Casing Cementing 1173.50 1174.50 0
2020-02-25 Cement Plug 1174.50 1190.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 7955 0.0 0.0 0.0
1985 4687 0.0 0.0 0.0
1986 7297 0.0 0.0 0.0
1987 8088 0.0 0.0 0.0
1988 8245 0.0 0.0 0.0
1989 7048 0.0 0.0 0.0
1990 8626 0.0 0.0 0.0
1991 8254 0.0 0.0 0.0
1992 8086 0.0 0.0 0.0
1993 8460 0.0 0.0 0.0
1994 8589 0.0 0.0 0.0
1995 8495 0.0 0.0 0.0
1996 8717 0.0 0.0 0.0
1997 8748 0.0 0.0 0.0
1998 8224 0.0 0.0 0.0
1999 8621 0.0 0.0 0.0
2000 8777 0.0 0.0 0.0
2001 7917 0.0 0.0 0.0
2002 8666 0.0 0.0 0.0
2003 8357 0.0 0.0 0.0
2004 7982 0.0 0.0 0.0
2005 6836 0.0 0.0 0.0
2006 8507 0.0 0.0 0.0
2007 4761 0.0 0.0 0.0
2008 4478 0.0 0.0 0.0
2009 7611 0.0 0.0 0.0
2010 7279 0.0 0.0 0.0
2011 7563 0.0 0.0 0.0
2012 8620 0.0 0.0 0.0
2013 6756 0.0 0.0 0.0
2014 6967 0.0 0.0 0.0
2015 8538 0.0 0.0 0.0
2016 8383 0.0 0.0 0.0
2017 6918 0.0 0.0 0.0
2018 8343 0.0 0.0 0.0
2019 7636 0.0 0.0 0.0
2020 312 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-02-26 No Incident Encountered 0.00 0.00
2020-04-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References