If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0205030108000 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.663692,"lon":-114.279526,"icon":""}]} |
Location: 00/08-01-020-03W5/0 | |
Location Alias: 00/08-01-20-03 W5M | |
Location Alias 2: 00/08-01-020-03 W5/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 5 | |
Range: 03 | |
Section: 01 | |
County/Municipality: Turner Valley | |
Well Name: CPEC TV 8-1-20-3 | |
Operator Name: Crescent Point Energy Corp. | |
License Number: 0012006 | |
License Date: 1956-08-27 | |
License Status: Issued | |
Spud Date: 1914-07-27 | |
Final Drill Date: 1930-12-21 | |
Well Total Depth: 1567.00 m | |
Surface Hole Latitude: 50.663692 | |
Surface Hole Longitude: -114.279526 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1930-08-21 | Production Casing Operation Performed |
1930-12-21 | Finished Drilling |
1930-12-21 | Perforation Treatment Performed - Open-Hole Completion |
1930-12-21 | Well Mode changed to Drilled and Cased |
1931-01-21 | Perforation Treatment Performed - Fractured |
1931-06-16 | Well Began Production |
1931-06-16 | Well Fluid changed to Gas |
1931-06-16 | Well Mode changed to Flowing |
1956-08-27 | Obtained License |
2020-02-13 | Perforation Treatment Performed - Cement Squeeze |
2020-02-13 | Plug Back Performed |
2020-02-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-02-20 | Perforation Treatment Performed - Jet Perforation |
2020-02-20 | Plug Back Performed |
2020-02-20 | Well Fluid changed to Gas |
2020-02-20 | Well Mode changed to Abandoned Zone |
2020-02-24 | Perforation Treatment Performed - Jet Perforation |
2020-02-24 | Perforation Treatment Performed - Remedial Casing |
2020-02-25 | Perforation Treatment Performed - Cement Plug |
2020-02-25 | Plug Back Performed |
2020-02-26 | Perforation Treatment Performed - Abrasa-Jet Perforation |
2020-02-26 | Perforation Treatment Performed - Remedial Casing |
2020-02-27 | Perforation Treatment Performed - Jet Perforation |
2020-02-28 | Perforation Treatment Performed - Cement Squeeze |
2020-03-02 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-02 | Perforation Treatment Performed - Jet Perforation |
2020-03-02 | Plug Back Performed |
2020-03-04 | Perforation Treatment Performed - Cement Squeeze |
2020-03-05 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-05 | Perforation Treatment Performed - Jet Perforation |
2020-03-05 | Plug Back Performed |
2020-03-06 | Perforation Treatment Performed - Cement Squeeze |
2020-03-09 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-09 | Perforation Treatment Performed - Jet Perforation |
2020-03-09 | Plug Back Performed |
2020-03-10 | Perforation Treatment Performed - Cement Squeeze |
2020-03-11 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-11 | Plug Back Performed |
2020-03-12 | Perforation Treatment Performed - Jet Perforation |
2020-03-17 | Perforation Treatment Performed - Cement Squeeze |
2020-03-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-18 | Plug Back Performed |
2020-03-19 | Perforation Treatment Performed - Jet Perforation |
2020-03-20 | Perforation Treatment Performed - Cement Squeeze |
2020-03-23 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-23 | Perforation Treatment Performed - Jet Perforation |
2020-03-23 | Plug Back Performed |
2020-03-25 | Perforation Treatment Performed - Cement Squeeze |
2020-03-26 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2020-03-26 | Plug Back Performed |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1930-12-21 | Open Hole/Barefoot Completion | 1452.70 | 1567.00 | 0 |
2020-02-26 | Hydra Jet Perforation | 1148.00 | 1174.50 | 0 |
2020-02-26 | Remedial Casing Cementing | 1148.00 | 1174.50 | 0 |
2020-02-27 | Perforation | 959.00 | 960.00 | 13 |
2020-02-28 | Cement Squeeze | 959.00 | 960.00 | 0 |
2020-03-02 | Packing Device Capped w/Cement | 938.40 | 954.00 | 0 |
2020-03-02 | Perforation | 851.00 | 852.00 | 13 |
2020-03-04 | Cement Squeeze | 851.00 | 852.00 | 0 |
2020-03-05 | Packing Device Capped w/Cement | 836.10 | 848.00 | 0 |
2020-03-05 | Perforation | 698.00 | 699.00 | 13 |
2020-03-06 | Cement Squeeze | 698.00 | 699.00 | 0 |
1931-01-21 | Fracture | 1478.90 | 1567.00 | 0 |
2020-03-09 | Packing Device Capped w/Cement | 684.50 | 695.00 | 0 |
2020-03-09 | Perforation | 679.00 | 680.00 | 17 |
2020-03-10 | Cement Squeeze | 679.00 | 680.00 | 0 |
2020-03-11 | Packing Device Capped w/Cement | 663.60 | 675.00 | 0 |
2020-03-12 | Perforation | 570.00 | 571.00 | 17 |
2020-03-12 | Perforation | 560.00 | 561.00 | 17 |
2020-03-17 | Cement Squeeze | 560.00 | 571.00 | 0 |
2020-03-18 | Packing Device Capped w/Cement | 544.80 | 556.00 | 0 |
2020-03-19 | Perforation | 431.00 | 432.00 | 17 |
2020-03-20 | Cement Squeeze | 431.00 | 432.00 | 0 |
2020-02-13 | Cement Squeeze | 1452.70 | 1567.00 | 0 |
2020-03-23 | Packing Device Capped w/Cement | 416.00 | 427.00 | 0 |
2020-03-23 | Perforation | 324.00 | 325.00 | 17 |
2020-03-25 | Cement Squeeze | 324.00 | 325.00 | 0 |
2020-03-26 | Packing Device Capped w/Cement | 308.60 | 320.00 | 0 |
2020-02-20 | Packing Device Capped w/Cement | 1388.50 | 1446.60 | 0 |
2020-02-20 | Perforation | 1259.00 | 1260.00 | 13 |
2020-02-24 | Perforation | 1173.50 | 1174.50 | 13 |
2020-02-24 | Remedial Casing Cementing | 1259.00 | 1260.00 | 0 |
2020-02-24 | Remedial Casing Cementing | 1173.50 | 1174.50 | 0 |
2020-02-25 | Cement Plug | 1174.50 | 1190.00 | 0 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1984 | 7955 | 0.0 | 0.0 | 0.0 |
1985 | 4687 | 0.0 | 0.0 | 0.0 |
1986 | 7297 | 0.0 | 0.0 | 0.0 |
1987 | 8088 | 0.0 | 0.0 | 0.0 |
1988 | 8245 | 0.0 | 0.0 | 0.0 |
1989 | 7048 | 0.0 | 0.0 | 0.0 |
1990 | 8626 | 0.0 | 0.0 | 0.0 |
1991 | 8254 | 0.0 | 0.0 | 0.0 |
1992 | 8086 | 0.0 | 0.0 | 0.0 |
1993 | 8460 | 0.0 | 0.0 | 0.0 |
1994 | 8589 | 0.0 | 0.0 | 0.0 |
1995 | 8495 | 0.0 | 0.0 | 0.0 |
1996 | 8717 | 0.0 | 0.0 | 0.0 |
1997 | 8748 | 0.0 | 0.0 | 0.0 |
1998 | 8224 | 0.0 | 0.0 | 0.0 |
1999 | 8621 | 0.0 | 0.0 | 0.0 |
2000 | 8777 | 0.0 | 0.0 | 0.0 |
2001 | 7917 | 0.0 | 0.0 | 0.0 |
2002 | 8666 | 0.0 | 0.0 | 0.0 |
2003 | 8357 | 0.0 | 0.0 | 0.0 |
2004 | 7982 | 0.0 | 0.0 | 0.0 |
2005 | 6836 | 0.0 | 0.0 | 0.0 |
2006 | 8507 | 0.0 | 0.0 | 0.0 |
2007 | 4761 | 0.0 | 0.0 | 0.0 |
2008 | 4478 | 0.0 | 0.0 | 0.0 |
2009 | 7611 | 0.0 | 0.0 | 0.0 |
2010 | 7279 | 0.0 | 0.0 | 0.0 |
2011 | 7563 | 0.0 | 0.0 | 0.0 |
2012 | 8620 | 0.0 | 0.0 | 0.0 |
2013 | 6756 | 0.0 | 0.0 | 0.0 |
2014 | 6967 | 0.0 | 0.0 | 0.0 |
2015 | 8538 | 0.0 | 0.0 | 0.0 |
2016 | 8383 | 0.0 | 0.0 | 0.0 |
2017 | 6918 | 0.0 | 0.0 | 0.0 |
2018 | 8343 | 0.0 | 0.0 | 0.0 |
2019 | 7636 | 0.0 | 0.0 | 0.0 |
2020 | 312 | 0.0 | 0.0 | 0.0 |
For data sources see[5]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2020-02-26 | No Incident Encountered | 0.00 | 0.00 |
2020-04-08 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[6]