X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0205010110000

Well Details

Well ID: 0205010110000
Loading map...
Location: 00/10-01-020-01W5/0
Location Alias: 00/10-01-20-01 W5M
Location Alias 2: 00/10-01-020-01 W5/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 5
Range: 01
Section: 01
County/Municipality: Foothills County
Well Name: COMPTON OKOTOKS 10-1-20-1
Operator Name: Lexin Resources Ltd.
License Number: 0030770
License Date: 1966-08-05
License Status: Abandoned
Spud Date: 1966-08-10
Final Drill Date: 1966-10-02
Well Total Depth: 3014.50 m
Surface Hole Latitude: 50.668478
Surface Hole Longitude: -114.010270

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1966-08-05 Obtained License
1966-08-31 Drill Stem Test Performed
1966-09-02 Drill Stem Test Performed
1966-09-03 Drill Stem Test Performed
1966-09-14 Drill Stem Test Performed
1966-09-16 Drill Stem Test Performed
1966-09-17 Drill Stem Test Performed
1966-09-23 Drill Stem Test Performed
1966-10-02 Finished Drilling
1966-10-05 Production Casing Operation Performed
1966-10-08 Perforation Treatment Performed - Bullet Perforation
1966-10-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-14 Perforation Treatment Performed - Bullet Perforation
1966-10-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1966-10-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-10-22 Perforation Treatment Performed - Bullet Perforation
1966-11-12 Perforation Treatment Performed - Cement Squeeze
1966-11-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1966-11-18 Perforation Treatment Performed - Bullet Perforation
1966-12-30 Well Mode changed to Drilled and Cased
1974-06-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-02-04 Perforation Treatment Performed - Jet Perforation
1977-02-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-02-18 Perforation Treatment Performed - Fractured
1977-02-23 Perforation Treatment Performed - Cement Squeeze
1997-11-01 Well Log Performed
1997-11-02 Perforation Treatment Performed - Jet Perforation
1997-11-03 Perforation Treatment Performed - Acid Squeeze - Press Used
1997-11-06 Well Log Performed
2019-10-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-20 Plug Back Performed
2019-10-20 Well Log Performed
2019-10-20 Well Mode changed to Abandoned Zone
2019-10-21 Perforation Treatment Performed - Cement Plug
2019-10-21 Perforation Treatment Performed - Jet Perforation
2019-10-21 Plug Back Performed
2019-10-21 Well Log Performed
2019-10-23 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1966-10-08 Bullet Perforation 2960.50 2963.00 3
1966-11-12 Cement Squeeze 2499.40 2501.80 0
1966-11-18 Bullet Perforation 2487.20 2491.70 3
1966-11-18 Acid Treatment 2487.20 2491.70 0
1974-06-06 Packing Device Capped w/Cement 2465.80 2465.80 0
1977-02-04 Perforation 2051.30 2063.50 3
1977-02-09 Acid Treatment 2051.30 2063.50 0
1977-02-18 Fracture 2051.30 2063.50 0
1977-02-23 Cement Squeeze 2051.30 2063.50 0
1997-11-02 Perforation 2480.50 2484.20 13
1997-11-02 Perforation 2484.70 2485.60 13
1966-10-09 Acid Treatment 2960.50 2963.00 0
1997-11-02 Perforation 2490.50 2491.40 13
1997-11-03 Acid Treatment 2480.50 2491.40 0
2019-10-20 Packing Device Capped w/Cement 2457.00 2465.20 0
2019-10-20 Packing Device Capped w/Cement 2037.00 2045.00 0
2019-10-21 Perforation 600.00 601.00 17
2019-10-21 Perforation 408.00 409.00 17
2019-10-21 Cement Plug 349.20 616.00 0
1966-10-14 Bullet Perforation 2957.50 2958.70 3
1966-10-14 Bullet Perforation 2964.20 2966.60 3
1966-10-14 Bullet Perforation 2968.40 2970.30 3
1966-10-15 Acid Treatment 2957.50 2970.30 0
1966-10-19 Packing Device Capped w/Cement 2935.20 2935.20 0
1966-10-22 Bullet Perforation 2499.40 2501.80 3
1966-10-22 Acid Treatment 2499.40 2501.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1966 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-10-23 No Incident Encountered 0.00 0.00

For data sources see[6]

References