X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204271011002

Well Details

Well ID: 0204271011002
Loading map...
Location: 00/11-10-020-27W4/2
Location Alias: 00/11-10-20-27 W4M
Location Alias 2: 00/11-10-020-27 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 27
Section: 10
County/Municipality: Foothills County
Well Name: COMPTON ET AL GLADYS 11-10-20-27
Operator Name: Lexin Resources Ltd.
License Number: 0068660
License Date: 1978-03-03
License Status: Suspension
Spud Date: 1978-05-22
Final Drill Date: 1978-06-26
Well Total Depth: 2545.10 m
Surface Hole Latitude: 50.684401
Surface Hole Longitude: -113.668318

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-03-03 Obtained License
1978-05-22 Lost Circulation Occurred
1978-06-09 Drill Stem Test Performed
1978-06-26 Finished Drilling
1978-06-26 Well Mode changed to Drilled and Cased
1978-06-27 Drill Stem Test Performed
1978-06-28 Drill Stem Test Performed
1978-06-29 Production Casing Operation Performed
1978-08-29 Perforation Treatment Performed - Jet Perforation
1978-08-30 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-08 Perforation Treatment Performed - Jet Perforation
1978-09-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-09-11 Perforation Treatment Performed - Jet Perforation
1978-09-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-11-30 Perforation Treatment Performed - Fractured
1978-12-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1978-12-09 Perforation Treatment Performed - Fractured
1978-12-19 Perforation Treatment Performed - Jet Perforation
1978-12-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-03 Perforation Treatment Performed - Jet Perforation
1979-01-04 Perforation Treatment Performed - Fractured
1979-02-19 Well Began Production
1979-02-19 Well Fluid changed to Crude Oil
1979-02-19 Well Mode changed to Pumping
1982-07-20 Well Fluid changed to Crude Oil
1982-07-20 Well Mode changed to Suspended
1999-05-29 Perforation Treatment Performed - Jet Perforation
1999-05-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1999-05-31 Perforation Treatment Performed - Acid Wash - No Pressure
1999-06-03 Perforation Treatment Performed - Fractured
1999-07-26 Well Fluid changed to Crude Oil
1999-07-26 Well Mode changed to Suspended
2019-09-06 Well Log Performed
2019-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-09-07 Perforation Treatment Performed - Cement Plug
2019-09-07 Plug Back Performed
2019-09-07 Well Fluid changed to Crude Oil
2019-09-07 Well Log Performed
2019-09-07 Well Mode changed to Abandoned Zone

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1978-08-29 Perforation 2111.30 2114.10 7
1978-12-09 Fracture 2076.60 2081.80 0
1978-12-19 Perforation 2055.90 2056.80 13
1978-12-19 Perforation 2050.70 2051.90 13
1978-12-20 Acid Treatment 2050.70 2056.80 0
1979-01-03 Perforation 2050.70 2051.90 13
1979-01-03 Perforation 2055.90 2056.80 13
1979-01-04 Fracture 2050.70 2056.80 0
1999-05-29 Perforation 2506.00 2519.50 14
1999-05-31 Acid Wash 2506.00 2519.50 0
1999-05-31 Acid Treatment 2506.00 2519.50 0
1978-08-29 Perforation 2122.30 2126.30 7
1999-06-03 Fracture 2506.00 2519.50 0
2019-09-07 Cement Plug 2360.00 2471.00 0
2019-09-07 Packing Device Capped w/Cement 2060.00 2068.00 0
2019-09-07 Packing Device Capped w/Cement 2034.00 2042.00 0
1978-08-30 Acid Treatment 2111.30 2126.30 0
1978-09-08 Perforation 2090.30 2097.90 7
1978-09-09 Acid Treatment 2090.30 2097.90 0
1978-09-11 Perforation 2076.60 2081.80 7
1978-09-12 Acid Treatment 2076.60 2081.80 0
1978-11-30 Fracture 2076.60 2081.80 0
1978-12-08 Acid Treatment 2076.60 2081.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5262 0.0 0.0 0.0
1980 3130 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
1978-05-22 Lost Circulation 27.40 39.00
2019-09-08 No Incident Encountered 0.00 0.00

For data sources see[6]

References