X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204232306002

Well Details

Well ID: 0204232306002
Loading map...
Location: 00/06-23-020-23W4/2
Location Alias: 00/06-23-20-23 W4M
Location Alias 2: 00/06-23-020-23 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 23
Section: 23
County/Municipality: Vulcan County
Well Name: HOUSTON SHOLDICE 6-23-20-23
Operator Name: Houston Oil & Gas Ltd.
License Number: 0227237
License Date: 1999-10-07
License Status: Issued
Spud Date: 1999-10-17
Final Drill Date: 1999-10-19
Well Total Depth: 997.00 m
Surface Hole Latitude: 50.707715
Surface Hole Longitude: -113.091636

For data sources see[1][2]

Well History

Date Event
1999-10-07 Obtained License
1999-10-18 Surface Casing Operation Performed
1999-10-19 Finished Drilling
1999-10-19 Well Mode changed to Drilled and Cased
1999-10-20 Production Casing Operation Performed
1999-10-20 Rig Released
1999-10-27 Well Log Performed
1999-10-29 Perforation Treatment Performed - Jet Perforation
1999-10-30 Perforation Treatment Performed - Fractured
2003-01-27 Perforation Treatment Performed - Jet Perforation
2003-01-29 Perforation Treatment Performed - Fractured
2003-06-08 Well Log Performed
2003-06-09 Perforation Treatment Performed - Jet Perforation
2003-06-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-06-19 Perforation Treatment Performed - Fractured
2003-09-05 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-10-29 Perforation 963.50 969.00 13
2003-06-19 Fracture 717.00 720.00 0
2003-09-05 Perforation 620.00 622.00 17
1999-10-30 Fracture 963.50 969.00 0
2003-01-27 Perforation 898.00 903.00 14
2003-01-27 Perforation 880.00 885.00 14
2003-01-27 Perforation 866.00 871.00 14
2003-01-27 Perforation 857.00 862.00 14
2003-01-29 Fracture 857.00 903.00 0
2003-06-09 Perforation 717.00 720.00 17
2003-06-19 Acid Treatment 717.00 720.00 0

For data sources see[4]



References