X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204180202003

Well Details

Well ID: 0204180202003
Loading map...
Location: 00/02-02-020-18W4/3
Location Alias: 00/02-02-20-18 W4M
Location Alias 2: 00/02-02-020-18 W4/03
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 18
Section: 02
County/Municipality: County of Newell
Well Name: CVE 2A LATHOM 2-2-20-18
Operator Name: Cenovus Energy Inc.
License Number: 0260437
License Date: 2001-10-11
License Status: RecCertified
Spud Date: 2001-10-18
Final Drill Date: 2001-10-22
Well Total Depth: 1268.00 m
Surface Hole Latitude: 50.659824
Surface Hole Longitude: -112.388730

For data sources see[1][2]

Well History

Date Event
2001-10-11 Obtained License
2001-10-18 Surface Casing Operation Performed
2001-10-22 Finished Drilling
2001-10-22 Well Log Performed
2001-10-22 Well Mode changed to Drilled and Cased
2001-10-23 Production Casing Operation Performed
2001-10-23 Rig Released
2001-10-28 Perforation Treatment Performed - Jet Perforation
2001-10-28 Well Log Performed
2001-11-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-11-03 Perforation Treatment Performed - Jet Perforation
2001-11-03 Plug Back Performed
2001-11-03 Well Log Performed
2001-11-17 Perforation Treatment Performed - Fractured
2001-11-25 Perforation Treatment Performed - Jet Perforation
2001-11-25 Well Log Performed
2001-12-17 Well Fluid changed to Crude Oil
2001-12-17 Well Mode changed to Potential
2001-12-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-12-18 Plug Back Performed
2001-12-18 Well Fluid changed to Crude Oil
2001-12-18 Well Mode changed to Abandoned Zone
2001-12-19 Perforation Treatment Performed - Jet Perforation
2001-12-19 Well Log Performed
2002-01-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-01-12 Plug Back Performed
2002-01-12 Well Log Performed
2002-02-05 Well Log Performed
2002-02-14 Perforation Treatment Performed - Jet Perforation
2002-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-07-04 Plug Back Performed
2008-07-28 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2001-10-28 Perforation 1252.00 1253.00 20
2002-02-14 Perforation 418.90 419.90 7
2002-07-04 Packing Device Capped w/Cement 402.00 410.00 0
2001-11-03 Packing Device Capped w/Cement 1243.00 1251.00 0
2001-11-03 Perforation 1221.00 1224.50 17
2001-11-17 Fracture 1221.00 1224.50 0
2001-11-25 Perforation 1204.00 1206.00 17
2001-12-18 Packing Device Capped w/Cement 1209.00 1217.00 0
2001-12-18 Packing Device Capped w/Cement 1200.00 1203.00 0
2001-12-19 Perforation 1187.50 1189.50 17
2002-01-12 Packing Device Capped w/Cement 1175.00 1183.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 13 0.0 0.0 0.0

For data sources see[5]

References