X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204173516000

Well Details

Well ID: 0204173516000
Loading map...
Location: 00/16-35-020-17W4/0
Location Alias: 00/16-35-20-17 W4M
Location Alias 2: 00/16-35-020-17 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 17
Section: 35
County/Municipality: County of Newell
Well Name: SUN GREAT WEST NO. 1 WELL
Operator Name: Suncor Energy Inc.
License Number: 0002220
License Date: 1950-10-30
License Status: RecCertified
Spud Date: 1950-11-02
Final Drill Date: 1950-12-15
Well Total Depth: 1483.50 m
Surface Hole Latitude: 50.744809
Surface Hole Longitude: -112.246645

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1950-10-30 Obtained License
1950-11-13 Drill Stem Test Performed
1950-11-14 Drill Stem Test Performed
1950-12-15 Drill Stem Test Performed
1950-12-15 Finished Drilling
1950-12-16 Drill Stem Test Performed
1950-12-18 Production Casing Operation Performed
1950-12-22 Drill Stem Test Performed
1950-12-22 Perforation Treatment Performed - Bullet Perforation
1950-12-23 Drill Stem Test Performed
1950-12-23 Perforation Treatment Performed - Bullet Perforation
1950-12-24 Drill Stem Test Performed
1950-12-24 Perforation Treatment Performed - Bullet Perforation
1950-12-26 Drill Stem Test Performed
1950-12-26 Perforation Treatment Performed - Bullet Perforation
1950-12-27 Drill Stem Test Performed
1950-12-27 Perforation Treatment Performed - Bullet Perforation
1950-12-29 Drill Stem Test Performed
1950-12-29 Perforation Treatment Performed - Bullet Perforation
1951-01-12 Well Mode changed to Drilled and Cased
1959-08-01 Perforation Treatment Performed - Cement Squeeze
1959-08-04 Perforation Treatment Performed - Cement Squeeze
1959-08-09 Perforation Treatment Performed - Cement Squeeze
1959-08-12 Perforation Treatment Performed - Bullet Perforation
1959-08-14 Perforation Treatment Performed - Bullet Perforation
1960-11-02 Well Began Production
1960-11-02 Well Fluid changed to Gas
1960-11-02 Well Mode changed to Flowing
1969-12-14 Perforation Treatment Performed - Cement Plug
1969-12-15 Well Abandoned
1969-12-15 Well Fluid changed to Gas
1969-12-15 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1950-12-22 Bullet Perforation 932.10 932.70 26
1950-12-29 Bullet Perforation 984.50 986.90 13
1959-08-01 Cement Squeeze 972.90 989.10 0
1959-08-04 Cement Squeeze 966.80 989.10 0
1959-08-09 Cement Squeeze 941.80 989.10 0
1959-08-12 Bullet Perforation 928.10 929.30 10
1959-08-14 Bullet Perforation 981.80 983.30 13
1959-08-14 Bullet Perforation 929.60 931.20 13
1969-12-14 Cement Plug 844.90 996.40 0
1950-12-23 Bullet Perforation 927.50 928.10 26
1950-12-23 Bullet Perforation 923.80 924.50 26
1950-12-24 Bullet Perforation 986.60 987.20 26
1950-12-24 Bullet Perforation 981.50 982.10 26
1950-12-26 Bullet Perforation 986.90 987.60 26
1950-12-26 Bullet Perforation 981.50 982.10 26
1950-12-27 Bullet Perforation 984.50 986.90 26
1950-12-29 Bullet Perforation 981.50 984.50 26

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 720 0.0 0.0 0.0
1969 1135 0.0 0.0 0.0

For data sources see[5]

References