X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204162611000

Well Details

Well ID: 0204162611000
Loading map...
Location: 00/11-26-020-16W4/0
Location Alias: 00/11-26-20-16 W4M
Location Alias 2: 00/11-26-020-16 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 16
Section: 26
County/Municipality: County of Newell
Well Name: SUN CAN-DELHI COUNTESS 11-26-20-16
Operator Name: Suncor Energy Inc.
License Number: 0019338
License Date: 1960-07-06
License Status: RecCertified
Spud Date: 1960-07-09
Final Drill Date: 1960-07-14
Well Total Depth: 976.90 m
Surface Hole Latitude: 50.726745
Surface Hole Longitude: -112.120198

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1960-07-06 Obtained License
1960-07-13 Drill Stem Test Performed
1960-07-14 Drill Stem Test Performed
1960-07-14 Finished Drilling
1960-07-14 Well Mode changed to Drilled and Cased
1960-07-16 Production Casing Operation Performed
1960-07-17 Perforation Treatment Performed - Jet Perforation
1960-11-01 Well Began Production
1960-11-01 Well Fluid changed to Gas
1960-11-01 Well Mode changed to Flowing
1960-11-26 Perforation Treatment Performed - Acid Squeeze - Press Used
1960-12-14 Perforation Treatment Performed - Fractured
1961-01-13 Perforation Treatment Performed - Condensate Squeeze
1961-04-04 Well Fluid changed to Gas
1961-04-04 Well Mode changed to Suspended
1968-05-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1968-05-23 Well Abandoned
1968-05-23 Well Fluid changed to Gas
1968-05-23 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1960-07-17 Perforation 969.60 971.10 13
1960-11-26 Acid Treatment 969.60 971.10 0
1960-12-14 Fracture 969.60 971.10 0
1961-01-13 Condensate Squeeze 969.60 971.10 0
1968-05-23 Packing Device Capped w/Cement 963.20 963.20 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References