X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204150601003

Well Details

Well ID: 0204150601003
Loading map...
Location: 00/01-06-020-15W4/3
Location Alias: 00/01-06-20-15 W4M
Location Alias 2: 00/01-06-020-15 W4/03
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 15
Section: 06
County/Municipality: County of Newell
Well Name: TXNE 1C COUNTESS 1-6-20-15
Operator Name: Torxen Energy Ltd.
License Number: 0436353
License Date: 2011-08-26
License Status: Issued
Spud Date: 2011-09-01
Final Drill Date: 2011-09-07
Well Total Depth: 1147.00 m
Surface Hole Latitude: 50.661126
Surface Hole Longitude: -112.061060

For data sources see[1][2]

Well History

Date Event
2011-08-26 Obtained License
2011-08-27 Well Log Performed
2011-09-01 Surface Casing Operation Performed
2011-09-07 Direction Drilling Operation Performed - Deviate
2011-09-07 Finished Drilling
2011-09-07 Well Mode changed to Drilled and Cased
2011-09-08 Production Casing Operation Performed
2011-09-08 Rig Released
2011-09-08 Well Log Performed
2011-09-16 Well Log Performed
2011-09-29 Perforation Treatment Performed - Jet Perforation
2011-09-29 Well Log Performed
2011-10-11 Perforation Treatment Performed - Jet Perforation
2011-11-03 Perforation Treatment Performed - Bridge Plug No Cement Required
2011-11-03 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-11-03 Plug Back Performed
2011-11-04 Perforation Treatment Performed - Jet Perforation
2011-11-09 Perforation Treatment Performed - Fractured
2011-12-20 Well Began Production
2011-12-20 Well Fluid changed to Crude Oil
2011-12-20 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-09-07 598.30 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-09-29 Perforation 1112.00 1113.00 17
2011-10-11 Perforation 1103.00 1104.00 17
2011-11-03 Packing Dev Cpd w/Res-Gyp Cem 1106.00 1109.00 0
2011-11-03 Bridge Plug, No Cement 1100.00 1100.50 0
2011-11-03 Packing Dev Cpd w/Res-Gyp Cem 1092.00 1100.00 0
2011-11-04 Perforation 1070.00 1073.00 17
2011-11-09 Fracture 1070.00 1073.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 288 0.0 0.0 0.0
2012 8692 0.0 0.0 0.0
2013 8656 0.0 0.0 0.0
2014 7469 0.0 0.0 0.0
2015 8599 0.0 0.0 0.0
2016 8782 0.0 0.0 0.0
2017 8184 0.0 0.0 0.0
2018 8754 0.0 0.0 0.0
2019 8080 0.0 0.0 0.0
2020 1992 0.0 0.0 0.0

For data sources see[6]

References