X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204150116002

Well Details

Well ID: 0204150116002
Loading map...
Location: 00/16-01-020-15W4/2
Location Alias: 00/16-01-20-15 W4M
Location Alias 2: 00/16-01-020-15 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 15
Section: 01
County/Municipality: County of Newell
Well Name: TXNE COUNTESS 16-1-20-15
Operator Name: Torxen Energy Ltd.
License Number: 0050889
License Date: 1974-08-20
License Status: Issued
Spud Date: 1974-09-07
Final Drill Date: 1974-09-08
Well Total Depth: 523.30 m
Surface Hole Latitude: 50.673359
Surface Hole Longitude: -111.944642

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1974-08-20 Obtained License
1974-09-08 Finished Drilling
1974-09-08 Well Log Performed
1974-09-08 Well Mode changed to Drilled and Cased
1974-09-09 Production Casing Operation Performed
1975-02-28 Perforation Treatment Performed - Jet Perforation
1975-03-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-12 Perforation Treatment Performed - Fractured
1975-03-18 Perforation Treatment Performed - Jet Perforation
1975-03-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-03-19 Perforation Treatment Performed - Fractured
2009-02-05 Perforation Treatment Performed - Jet Perforation
2009-03-03 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-02-28 Perforation 489.80 493.50 3
1975-03-18 Perforation 416.70 417.30 3
1975-03-18 Perforation 429.80 431.00 3
1975-03-19 Acid Treatment 370.30 431.00 0
1975-03-19 Fracture 370.30 431.00 0
2009-02-05 Perforation 293.50 297.00 13
2009-02-05 Perforation 290.00 291.00 13
2009-02-05 Perforation 281.00 282.00 13
1975-02-28 Perforation 498.70 499.90 3
1975-02-28 Perforation 501.40 502.00 3
1975-03-12 Acid Treatment 489.80 502.00 0
1975-03-12 Fracture 489.80 502.00 0
1975-03-18 Perforation 370.30 371.60 3
1975-03-18 Perforation 387.70 389.50 3
1975-03-18 Perforation 395.30 395.90 3
1975-03-18 Perforation 415.10 415.70 3

For data sources see[4]



References