X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204122208000

Well Details

Well ID: 0204122208000
Loading map...
Location: 00/08-22-020-12W4/0
Location Alias: 00/08-22-20-12 W4M
Location Alias 2: 00/08-22-020-12 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 12
Section: 22
County/Municipality: County of Newell
Well Name: PRINCESS C.P.R. 14-22-A
Operator Name: Chevron Canada Limited
License Number: B0001603
License Date: 1947-04-02
License Status: RecExempt
Spud Date: 1947-05-13
Final Drill Date: 1947-08-29
Well Total Depth: 1659.30 m
Surface Hole Latitude: 50.709448
Surface Hole Longitude: -111.575590

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1947-04-02 Obtained License
1947-08-29 Finished Drilling
1947-08-30 Well Log Performed
1947-08-31 Production Casing Operation Performed
1947-09-06 Drill Stem Test Performed
1947-09-06 Perforation Treatment Performed - Bullet Perforation
1947-09-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1947-09-07 Perforation Treatment Performed - Cement Squeeze
1947-09-08 Perforation Treatment Performed - Bullet Perforation
1947-09-09 Drill Stem Test Performed
1947-09-09 Perforation Treatment Performed - Bullet Perforation
1947-09-09 Perforation Treatment Performed - Cement Squeeze
1947-09-11 Perforation Treatment Performed - Bullet Perforation
1947-09-12 Drill Stem Test Performed
1947-09-13 Perforation Treatment Performed - Cement Plug
1947-09-22 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1947-09-06 Bullet Perforation 1582.20 1592.60 7
1947-09-07 Cement Squeeze 1582.20 1592.60 0
1947-09-07 Packing Device Capped w/Cement 1575.80 1575.80 0
1947-09-08 Bullet Perforation 1479.80 1480.70 13
1947-09-09 Bullet Perforation 1476.50 1479.50 7
1947-09-09 Cement Squeeze 1476.50 1480.70 0
1947-09-11 Bullet Perforation 1420.40 1422.20 13
1947-09-13 Cement Plug 1384.70 1415.20 0

For data sources see[4]



References