X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204121303000

Well Details

Well ID: 0204121303000
Loading map...
Location: 00/03-13-020-12W4/0
Location Alias: 00/03-13-20-12 W4M
Location Alias 2: 00/03-13-020-12 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 12
Section: 13
County/Municipality: County of Newell
Well Name: PRINCESS-C.P.R. NO.2
Operator Name: Chevron Canada Limited
License Number: B0000134
License Date: 1940-09-11
License Status: RecExempt
Spud Date: 1940-10-05
Final Drill Date: 1940-12-15
Well Total Depth: 1295.40 m
Surface Hole Latitude: 50.690506
Surface Hole Longitude: -111.542281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-09-11 Obtained License
1940-12-15 Drill Stem Test Performed
1940-12-15 Finished Drilling
1940-12-15 Production Casing Operation Performed
1940-12-15 Well Log Performed
1940-12-15 Well Mode changed to Drilled and Cased
1940-12-28 Perforation Treatment Performed - Open-Hole Completion
1941-01-07 Perforation Treatment Performed - Cement Plug
1941-01-07 Perforation Treatment Performed - Open-Hole Completion
1941-01-09 Perforation Treatment Performed - Jet Perforation
1941-01-15 Perforation Treatment Performed - Chemical Squeeze
1941-01-16 Perforation Treatment Performed - Cement Plug
1941-01-16 Perforation Treatment Performed - Chemical Squeeze
1941-01-16 Perforation Treatment Performed - Open-Hole Completion
1941-03-21 Well Began Production
1941-03-21 Well Fluid changed to Crude Oil
1941-03-21 Well Mode changed to Flowing
1941-05-25 Perforation Treatment Performed - Cement Plug
1941-05-25 Perforation Treatment Performed - Open-Hole Completion
1941-06-01 Perforation Treatment Performed - Cement Plug
1941-06-26 Perforation Treatment Performed - Jet Perforation
1941-06-29 Perforation Treatment Performed - Cement Plug
1941-07-02 Perforation Treatment Performed - Jet Perforation
1941-07-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1941-07-05 Perforation Treatment Performed - Cement Squeeze
1941-07-10 Perforation Treatment Performed - Jet Perforation
1941-07-11 Perforation Treatment Performed - Cement Squeeze
1941-07-14 Perforation Treatment Performed - Jet Perforation
1941-07-21 Perforation Treatment Performed - Cement Plug
1941-07-31 Perforation Treatment Performed - Jet Perforation
1941-08-09 Perforation Treatment Performed - Cement Plug
1941-08-09 Perforation Treatment Performed - Cement Squeeze
1941-08-10 Perforation Treatment Performed - Cement Plug
1941-08-19 Perforation Treatment Performed - Jet Perforation
1941-09-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1941-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1942-12-04 Well Fluid changed to Crude Oil
1942-12-04 Well Mode changed to Suspended
1943-08-04 Perforation Treatment Performed - Cement Plug
1943-08-04 Perforation Treatment Performed - Cement Squeeze
1943-08-04 Plug Back Performed
1943-08-04 Well Fluid changed to Crude Oil
1943-08-04 Well Mode changed to Abandoned Zone
1956-05-01 Well Abandoned
1956-05-27 Perforation Treatment Performed - Jet Perforation
1956-05-27 Well Log Performed
1956-05-29 Perforation Treatment Performed - Fractured
1994-08-10 Perforation Treatment Performed - Cement Squeeze
1994-08-10 Plug Back Performed
1994-08-15 Perforation Treatment Performed - Jet Perforation
1994-08-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-17 Perforation Treatment Performed - Jet Perforation
2008-12-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-12-16 Plug Back Performed
2008-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-12-28 Open Hole/Barefoot Completion 981.50 1013.50 0
1941-05-25 Cement Plug 982.70 987.50 0
1941-05-25 Open Hole/Barefoot Completion 981.50 982.70 0
1941-06-01 Cement Plug 973.20 982.70 0
1941-06-26 Perforation 992.10 993.30 10
1941-06-29 Cement Plug 970.80 997.90 0
1941-07-02 Perforation 976.90 979.00 13
1941-07-05 Cement Squeeze 976.90 979.00 0
1941-07-05 Packing Device Capped w/Cement 976.00 976.30 0
1941-07-10 Perforation 972.90 974.40 13
1941-07-11 Cement Squeeze 972.90 974.40 0
1941-01-07 Cement Plug 1005.20 1013.50 0
1941-07-14 Perforation 964.70 967.70 13
1941-07-21 Cement Plug 962.60 969.90 0
1941-07-31 Perforation 976.90 979.90 19
1941-08-09 Cement Squeeze 976.90 979.90 0
1941-08-09 Cement Plug 972.90 974.40 0
1941-08-10 Cement Plug 962.20 972.90 0
1941-08-19 Perforation 981.80 990.60 13
1941-09-01 Acid Treatment 981.80 990.60 0
1941-09-10 Acid Treatment 981.80 990.60 0
1943-08-04 Cement Squeeze 981.80 990.60 0
1941-01-07 Open Hole/Barefoot Completion 981.50 1005.20 0
1943-08-04 Cement Plug 970.50 1004.90 0
1956-05-27 Perforation 859.20 860.10 13
1956-05-27 Perforation 851.90 853.10 26
1956-05-27 Perforation 855.60 856.20 13
1956-05-29 Fracture 851.90 860.10 0
1994-08-10 Cement Squeeze 851.90 860.10 0
1994-08-15 Perforation 971.30 972.80 18
1994-08-17 Packing Device Capped w/Cement 967.50 970.00 0
1994-08-17 Perforation 962.00 963.50 18
2008-12-16 Packing Device Capped w/Cement 947.00 956.00 0
1941-01-09 Perforation 992.10 995.20 10
2008-12-17 Packing Device Capped w/Cement 840.00 850.00 0
1941-01-09 Perforation 989.10 992.10 7
1941-01-15 Chemical Squeeze 981.50 1005.20 0
1941-01-16 Chemical Squeeze 981.50 1005.20 0
1941-01-16 Cement Plug 997.90 1005.20 0
1941-01-16 Open Hole/Barefoot Completion 981.50 997.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References