X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204102006000

Well Details

Well ID: 0204102006000
Loading map...
Location: 00/06-20-020-10W4/0
Location Alias: 00/06-20-20-10 W4M
Location Alias 2: 00/06-20-020-10 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 10
Section: 20
County/Municipality: Special Areas No. 2
Well Name: CNRL PRINCESS 6-20-20-10
Operator Name: Canadian Natural Resources Limited
License Number: 0054941
License Date: 1975-09-16
License Status: Issued
Spud Date: 1975-10-03
Final Drill Date: 1975-10-05
Well Total Depth: 512.10 m
Surface Hole Latitude: 50.709923
Surface Hole Longitude: -111.355434

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-16 Obtained License
1975-10-05 Finished Drilling
1975-10-05 Production Casing Operation Performed
1975-10-05 Well Mode changed to Drilled and Cased
1975-10-10 Perforation Treatment Performed - Jet Perforation
1975-10-10 Perforation Treatment Performed - Selective Jet Perforations
1975-10-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1975-10-16 Perforation Treatment Performed - Fractured
1976-01-26 Well Began Production
1976-01-26 Well Fluid changed to Gas
1976-01-26 Well Mode changed to Flowing
1997-11-09 Well Log Performed
1997-11-16 Perforation Treatment Performed - Jet Perforation
1997-11-17 Perforation Treatment Performed - Fractured
1997-11-18 Perforation Treatment Performed - Fractured
1997-12-08 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-10-10 Perforation 484.60 485.20 13
1975-10-10 Perforation 429.80 430.10 3
1975-10-16 Acid Treatment 484.60 491.30 0
1975-10-16 Fracture 484.60 491.30 0
1975-10-16 Fracture 378.30 430.10 0
1997-11-16 Perforation 415.00 418.00 5
1997-11-16 Perforation 427.00 431.00 5
1997-11-17 Fracture 415.00 431.00 0
1997-11-18 Fracture 415.00 431.00 0
1975-10-10 Perforation 490.40 491.30 13
1975-10-10 Selective Jet Perforations 378.30 379.50 0
1975-10-10 Selective Jet Perforations 380.10 380.10 0
1975-10-10 Perforation 396.80 397.20 3
1975-10-10 Perforation 401.70 402.00 7
1975-10-10 Perforation 404.50 404.80 7
1975-10-10 Perforation 405.70 406.00 7
1975-10-10 Perforation 416.70 417.30 7

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 7116 0.0 0.0 0.0
1977 8635 0.0 0.0 0.0
1978 8743 0.0 0.0 0.0
1979 8513 0.0 0.0 0.0
1980 8555 0.0 0.0 0.0
1981 8759 0.0 0.0 0.0
1982 8681 0.0 0.0 0.0
1983 8735 0.0 0.0 0.0
1984 8658 0.0 0.0 0.0
1985 8719 0.0 0.0 0.0
1986 8724 0.0 0.0 0.0
1987 8749 0.0 0.0 0.0
1988 8574 0.0 0.0 0.0
1989 8706 0.0 0.0 0.0
1990 8744 0.0 0.0 0.0
1991 8506 0.0 0.0 0.0
1992 8742 0.0 0.0 0.0
1993 8673 0.0 0.0 0.0
1994 8644 0.0 0.0 0.0
1995 8042 0.0 0.0 0.0
1996 8747 0.0 0.0 0.0
1997 8529 0.0 0.0 0.0
1998 8738 0.0 0.0 0.0
1999 8621 0.0 0.0 0.0
2000 8619 0.0 0.0 0.0
2001 8677 0.0 0.0 0.0
2002 8702 0.0 0.0 0.0
2003 8706 0.0 0.0 0.0
2004 8783 0.0 0.0 0.0
2005 8718 0.0 0.0 0.0
2006 8759 0.0 0.0 0.0
2007 8719 0.0 0.0 0.0
2008 8651 0.0 0.0 0.0
2009 8737 0.0 0.0 0.0
2010 8744 0.0 0.0 0.0
2011 8733 0.0 0.0 0.0
2012 8761 0.0 0.0 0.0
2013 8483 0.0 0.0 0.0
2014 8743 0.0 0.0 0.0
2015 8751 0.0 0.0 0.0
2016 8723 0.0 0.0 0.0
2017 8714 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References