X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204083316002

Well Details

Well ID: 0204083316002
Loading map...
Location: 00/16-33-020-08W4/2
Location Alias: 00/16-33-20-08 W4M
Location Alias 2: 00/16-33-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 33
County/Municipality: Special Areas No. 2
Well Name: IMAGINEA JENNER 16-33-20-8
Operator Name: Cor4 Oil Corp.
License Number: 0084077
License Date: 1980-07-10
License Status: Issued
Spud Date: 1980-08-04
Final Drill Date: 1980-08-05
Well Total Depth: 671.00 m
Surface Hole Latitude: 50.745214
Surface Hole Longitude: -111.044449

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-07-10 Obtained License
1980-08-05 Finished Drilling
1980-08-06 Production Casing Operation Performed
1980-08-06 Well Mode changed to Drilled and Cased
1980-11-07 Perforation Treatment Performed - Jet Perforation
1980-11-07 Perforation Treatment Performed - Selective Jet Perforations
1980-11-16 Perforation Treatment Performed - Selective Jet Perforations
1980-11-19 Perforation Treatment Performed - Fractured
1981-11-05 Well Began Production
1981-11-05 Well Fluid changed to Gas
1981-11-05 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-11-07 Perforation 650.00 650.40 5
1980-11-16 Selective Jet Perforations 606.40 610.80 0
1980-11-16 Selective Jet Perforations 616.50 616.90 0
1980-11-16 Selective Jet Perforations 619.40 625.90 0
1980-11-16 Selective Jet Perforations 378.70 380.80 0
1980-11-16 Selective Jet Perforations 386.80 387.20 0
1980-11-16 Selective Jet Perforations 392.30 397.00 0
1980-11-16 Selective Jet Perforations 400.90 401.60 0
1980-11-16 Selective Jet Perforations 405.40 411.40 0
1980-11-16 Selective Jet Perforations 413.10 413.40 0
1980-11-16 Selective Jet Perforations 414.10 415.20 0
1980-11-07 Selective Jet Perforations 650.70 651.00 0
1980-11-16 Selective Jet Perforations 416.00 417.20 0
1980-11-16 Selective Jet Perforations 417.80 428.30 0
1980-11-19 Fracture 378.70 616.90 0
1980-11-07 Selective Jet Perforations 652.20 652.60 0
1980-11-07 Perforation 652.80 653.60 5
1980-11-07 Perforation 656.00 656.60 5
1980-11-07 Perforation 657.40 658.00 5
1980-11-16 Selective Jet Perforations 483.40 489.30 0
1980-11-16 Selective Jet Perforations 491.30 547.80 0
1980-11-16 Selective Jet Perforations 569.10 601.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1981 1317 0.0 0.0 0.0
1982 3978 0.0 0.0 0.0
1983 3639 0.0 0.0 0.0
1984 4342 0.0 0.0 0.0
1985 5035 0.0 0.0 0.0
1986 4135 0.0 0.0 0.0
1987 2272 0.0 0.0 0.0
1988 2857 0.0 0.0 0.0
1989 5640 0.0 0.0 0.0
1990 2862 0.0 0.0 0.0
1991 6672 0.0 0.0 0.0
1992 8215 0.0 0.0 0.0
1993 8573 0.0 0.0 0.0
1994 8450 0.0 0.0 0.0
1995 8675 0.0 0.0 0.0
1996 6434 0.0 0.0 0.0
1997 5068 0.0 0.0 0.0
1998 8672 0.0 0.0 0.0
1999 8691 0.0 0.0 0.0
2000 8733 0.0 0.0 0.0
2001 8568 0.0 0.0 0.0
2002 8001 0.0 0.0 0.0
2003 6412 0.0 0.0 0.0
2004 8763 0.0 0.0 0.0
2005 7959 0.0 0.0 0.0
2006 5747 0.0 0.0 0.0
2007 3611 0.0 0.0 0.0
2008 1464 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8757 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References