If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082114D32 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.71383,"lon":-111.059507,"icon":""}]} |
Location: D3/14-21-020-08W4/2 | |
Location Alias: D3/14-21-20-08 W4M | |
Location Alias 2: D3/14-21-020-08 W4/02 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 14-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0177341 | |
License Date: 1995-04-10 | |
License Status: Issued | |
Spud Date: 1995-06-09 | |
Final Drill Date: 1997-08-10 | |
Well Total Depth: 1265.00 m | |
Surface Hole Latitude: 50.713830 | |
Surface Hole Longitude: -111.059507 |
Date | Event |
---|---|
1995-04-10 | Obtained License |
1995-06-10 | Surface Casing Operation Performed |
1995-06-12 | Direction Drilling Operation Performed - Horizontal |
1995-06-15 | Production Casing Operation Performed |
1997-08-08 | Direction Drilling Operation Performed - Horizontal |
1997-08-10 | Finished Drilling |
1997-08-10 | Perforation Treatment Performed - Open-Hole Completion |
1997-08-10 | Rig Released |
1997-08-10 | Well Structure changed to Drain |
1997-08-30 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-06-12 | 770.00 | Horizontal |
1997-08-08 | 1115.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1997-08-10 | Open Hole/Barefoot Completion | 1044.70 | 1265.00 | 0 |
For data sources see[5]