X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082111B00

Well Details

Well ID: 0204082111B00
Loading map...
Location: B0/11-21-020-08W4/0
Location Alias: B0/11-21-20-08 W4M
Location Alias 2: B0/11-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 11-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0135382
License Date: 1988-08-08
License Status: Suspension
Spud Date: 1988-08-24
Final Drill Date: 1988-08-28
Well Total Depth: 995.00 m
Surface Hole Latitude: 50.711925
Surface Hole Longitude: -111.059786

For data sources see[1][2]

Well History

Date Event
1988-08-08 Obtained License
1988-08-25 Surface Casing Operation Performed
1988-08-26 Direction Drilling Operation Performed - Deviate
1988-08-28 Finished Drilling
1988-08-28 Well Mode changed to Drilled and Cased
1988-08-29 Production Casing Operation Performed
1988-08-29 Well Log Performed
1988-08-30 Rig Released
1988-08-30 Well Log Performed
1988-09-01 Perforation Treatment Performed - Jet Perforation
1988-09-05 Well Began Production
1988-09-05 Well Fluid changed to Crude Oil
1988-09-05 Well Mode changed to Pumping
2010-03-31 Well Fluid changed to Crude Oil
2010-03-31 Well Mode changed to Suspended
2013-11-04 Well Log Performed
2013-11-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-06 Perforation Treatment Performed - Cement Plug
2013-11-06 Plug Back Performed
2013-11-06 Well Fluid changed to Crude Oil
2013-11-06 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-08-26 334.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-01 Perforation 940.00 944.00 13
2013-11-06 Packing Device Capped w/Cement 533.00 957.00 0
2013-11-06 Cement Plug 109.00 533.00 0
2013-11-06 Cement Plug 4.00 109.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 2758 0.0 0.0 0.0
1989 8510 0.0 0.0 0.0
1990 8328 0.0 0.0 0.0
1991 8164 0.0 0.0 0.0
1992 8674 0.0 0.0 0.0
1993 8189 0.0 0.0 0.0
1994 8004 0.0 0.0 0.0
1995 8011 0.0 0.0 0.0
1996 7963 0.0 0.0 0.0
1997 7977 0.0 0.0 0.0
1998 8155 0.0 0.0 0.0
1999 8420 0.0 0.0 0.0
2000 8556 0.0 0.0 0.0
2001 8278 0.0 0.0 0.0
2002 8634 0.0 0.0 0.0
2003 8526 0.0 0.0 0.0
2004 8756 0.0 0.0 0.0
2005 8025 0.0 0.0 0.0
2006 1547 0.0 0.0 0.0
2007 5300 0.0 0.0 0.0
2008 8529 0.0 0.0 0.0
2009 288 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-07 No Incident Encountered 0.00 0.00

For data sources see[7]

References