X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082110A00

Well Details

Well ID: 0204082110A00
Loading map...
Location: A0/10-21-020-08W4/0
Location Alias: A0/10-21-20-08 W4M
Location Alias 2: A0/10-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 10-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0154624
License Date: 1992-11-20
License Status: Issued
Spud Date: 1992-11-28
Final Drill Date: 1992-12-01
Well Total Depth: 980.00 m
Surface Hole Latitude: 50.712697
Surface Hole Longitude: -111.052998

For data sources see[1][2]

Well History

Date Event
1992-11-20 Obtained License
1992-11-29 Surface Casing Operation Performed
1992-11-30 Direction Drilling Operation Performed - Deviate
1992-12-01 Finished Drilling
1992-12-01 Well Mode changed to Drilled and Cased
1992-12-02 Production Casing Operation Performed
1992-12-02 Rig Released
1992-12-02 Well Log Performed
1992-12-04 Perforation Treatment Performed - Jet Perforation
1992-12-07 Well Began Production
1992-12-07 Well Fluid changed to Crude Oil
1992-12-07 Well Mode changed to Pumping
1993-01-06 Well Log Performed
1993-01-16 Perforation Treatment Performed - Jet Perforation
1994-04-24 Perforation Treatment Performed - Cement Squeeze
1994-04-26 Perforation Treatment Performed - Jet Perforation
1994-04-26 Well Log Performed
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1994-07-17 Well Began Injection
1994-07-17 Well Fluid changed to Water
1994-07-17 Well Type changed to Disposal
1994-11-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-06 Perforation Treatment Performed - Jet Perforation
1995-02-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-11-30 240.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-12-04 Perforation 942.00 944.00 13
1993-01-16 Perforation 944.00 945.00 13
1994-04-24 Cement Squeeze 942.00 945.00 0
1994-04-26 Perforation 954.00 961.00 13
1994-11-14 Acid Treatment 954.00 961.00 0
1995-02-06 Perforation 954.00 968.00 17
1995-02-07 Acid Treatment 954.00 968.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 552 0.0 0.0 0.0
1993 7893 0.0 0.0 0.0
1994 2666 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

References