X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082109D00

Well Details

Well ID: 0204082109D00
Loading map...
Location: D0/09-21-020-08W4/0
Location Alias: D0/09-21-20-08 W4M
Location Alias 2: D0/09-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 9-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0156069
License Date: 1993-01-28
License Status: Suspension
Spud Date: 1993-03-17
Final Drill Date: 1993-03-21
Well Total Depth: 983.00 m
Surface Hole Latitude: 50.713019
Surface Hole Longitude: -111.046188

For data sources see[1][2]

Well History

Date Event
1993-01-28 Obtained License
1993-03-18 Surface Casing Operation Performed
1993-03-19 Direction Drilling Operation Performed - Deviate
1993-03-21 Finished Drilling
1993-03-21 Production Casing Operation Performed
1993-03-21 Well Log Performed
1993-03-21 Well Mode changed to Drilled and Cased
1993-03-22 Rig Released
1993-04-16 Well Log Performed
1993-04-19 Perforation Treatment Performed - Jet Perforation
1993-04-20 Perforation Treatment Performed - Jet Perforation
1993-05-01 Well Began Production
1993-05-01 Well Fluid changed to Crude Oil
1993-05-01 Well Mode changed to Pumping
2010-04-07 Well Fluid changed to Crude Oil
2010-04-07 Well Mode changed to Suspended
2013-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-10-25 Plug Back Performed
2013-10-25 Well Fluid changed to Crude Oil
2013-10-25 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-19 609.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-04-19 Perforation 923.50 925.00 13
1993-04-20 Perforation 925.00 926.50 13
2013-10-25 Packing Device Capped w/Cement 905.00 913.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 5340 0.0 0.0 0.0
1994 8367 0.0 0.0 0.0
1995 8611 0.0 0.0 0.0
1996 8586 0.0 0.0 0.0
1997 7894 0.0 0.0 0.0
1998 8169 0.0 0.0 0.0
1999 8544 0.0 0.0 0.0
2000 8612 0.0 0.0 0.0
2001 8661 0.0 0.0 0.0
2002 8622 0.0 0.0 0.0
2003 8476 0.0 0.0 0.0
2004 8754 0.0 0.0 0.0
2005 7312 0.0 0.0 0.0
2008 479 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-10-26 No Incident Encountered 0.00 0.00

For data sources see[7]

References