If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082107D30 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.707942,"lon":-111.046449,"icon":""}]} |
Location: D3/07-21-020-08W4/0 | |
Location Alias: D3/07-21-20-08 W4M | |
Location Alias 2: D3/07-21-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 7-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0177119 | |
License Date: 1995-03-28 | |
License Status: Suspension | |
Spud Date: 1995-06-20 | |
Final Drill Date: 1995-06-28 | |
Well Total Depth: 1228.00 m | |
Surface Hole Latitude: 50.707942 | |
Surface Hole Longitude: -111.046449 |
Date | Event |
---|---|
1995-03-28 | Obtained License |
1995-06-21 | Surface Casing Operation Performed |
1995-06-23 | Direction Drilling Operation Performed - Horizontal |
1995-06-26 | Production Casing Operation Performed |
1995-06-28 | Finished Drilling |
1995-06-28 | Perforation Treatment Performed - Open-Hole Completion |
1995-06-28 | Rig Released |
1995-06-28 | Well Log Performed |
1995-06-28 | Well Mode changed to Drilled and Cased |
1995-07-02 | Well Began Production |
1995-07-02 | Well Fluid changed to Crude Oil |
1995-07-02 | Well Mode changed to Pumping |
1995-07-13 | Well Log Performed |
2009-11-22 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2009-11-22 | Plug Back Performed |
2009-11-22 | Well Fluid changed to Crude Oil |
2009-11-22 | Well Mode changed to Abandoned and Whipstocked |
2009-11-26 | Well Log Performed |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1995-06-23 | 779.70 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1995-06-28 | Open Hole/Barefoot Completion | 1015.00 | 1228.00 | 0 |
2009-11-22 | Packing Device Capped w/Cement | 927.00 | 974.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1995 | 4004 | 0.0 | 0.0 | 0.0 |
1996 | 7323 | 0.0 | 0.0 | 0.0 |
1997 | 7984 | 0.0 | 0.0 | 0.0 |
1998 | 8455 | 0.0 | 0.0 | 0.0 |
1999 | 8628 | 0.0 | 0.0 | 0.0 |
2000 | 8606 | 0.0 | 0.0 | 0.0 |
2001 | 8605 | 0.0 | 0.0 | 0.0 |
2002 | 8598 | 0.0 | 0.0 | 0.0 |
2003 | 8470 | 0.0 | 0.0 | 0.0 |
2004 | 8735 | 0.0 | 0.0 | 0.0 |
2005 | 8540 | 0.0 | 0.0 | 0.0 |
2006 | 8476 | 0.0 | 0.0 | 0.0 |
2007 | 8085 | 0.0 | 0.0 | 0.0 |
2008 | 6399 | 0.0 | 0.0 | 0.0 |
2009 | 6471 | 0.0 | 0.0 | 0.0 |
For data sources see[6]