If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0204082105A00 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":50.70874,"lon":-111.061286,"icon":""}]} |
Location: A0/05-21-020-08W4/0 | |
Location Alias: A0/05-21-20-08 W4M | |
Location Alias 2: A0/05-21-020-08 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 020 | |
Meridian: 4 | |
Range: 08 | |
Section: 21 | |
County/Municipality: Special Areas No. 2 | |
Well Name: CARDINAL SUFFIELD 5-21-20-8 | |
Operator Name: Cardinal Energy Ltd. | |
License Number: 0133861 | |
License Date: 1988-05-13 | |
License Status: Issued | |
Spud Date: 1988-06-07 | |
Final Drill Date: 1988-06-12 | |
Well Total Depth: 1105.00 m | |
Surface Hole Latitude: 50.708740 | |
Surface Hole Longitude: -111.061286 |
Date | Event |
---|---|
1988-05-13 | Obtained License |
1988-06-08 | Surface Casing Operation Performed |
1988-06-09 | Direction Drilling Operation Performed - Deviate |
1988-06-12 | Finished Drilling |
1988-06-12 | Well Log Performed |
1988-06-12 | Well Mode changed to Drilled and Cased |
1988-06-13 | Production Casing Operation Performed |
1988-06-13 | Rig Released |
1988-06-15 | Perforation Treatment Performed - Jet Perforation |
1988-06-15 | Well Began Production |
1988-06-15 | Well Fluid changed to Crude Oil |
1988-06-15 | Well Log Performed |
1988-06-15 | Well Mode changed to Pumping |
1988-06-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-17 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1988-06-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-17 | Perforation Treatment Performed - Jet Perforation |
1988-06-17 | Plug Back Performed |
1988-06-20 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1988-06-20 | Perforation Treatment Performed - Jet Perforation |
1988-06-20 | Perforation Treatment Performed - Remedial Casing |
1988-06-20 | Plug Back Performed |
1988-06-22 | Perforation Treatment Performed - Jet Perforation |
1988-06-23 | Perforation Treatment Performed - Jet Perforation |
1988-06-24 | Well Log Performed |
1989-01-16 | Perforation Treatment Performed - Cement Squeeze |
1989-01-18 | Perforation Treatment Performed - Jet Perforation |
1989-01-18 | Well Log Performed |
1989-01-19 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-03-22 | Well Began Injection |
1989-03-22 | Well Fluid changed to Water |
1989-03-22 | Well Type changed to Disposal |
1989-05-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-07-15 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1989-09-18 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1990-09-21 | Perforation Treatment Performed - Acid Squeeze - Press Used |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
1988-06-09 | 580.00 | Deviate (5 - 79 degrees) |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1988-06-15 | Perforation | 1083.50 | 1084.50 | 13 |
1988-06-23 | Perforation | 931.00 | 933.00 | 13 |
1988-06-23 | Perforation | 932.00 | 933.00 | 13 |
1989-01-16 | Cement Squeeze | 926.00 | 933.00 | 0 |
1989-01-18 | Perforation | 951.00 | 953.00 | 13 |
1989-01-18 | Perforation | 944.00 | 947.00 | 13 |
1989-01-19 | Acid Treatment | 944.00 | 953.00 | 0 |
1989-05-18 | Acid Treatment | 944.00 | 953.00 | 0 |
1989-07-15 | Acid Treatment | 944.00 | 953.00 | 0 |
1989-09-18 | Acid Treatment | 944.00 | 953.00 | 0 |
1990-09-21 | Acid Treatment | 944.00 | 953.00 | 0 |
1988-06-16 | Acid Treatment | 1083.50 | 1084.50 | 0 |
1988-06-17 | Packing Device Capped w/Cement | 1071.00 | 1079.00 | 0 |
1988-06-17 | Perforation | 993.00 | 996.00 | 13 |
1988-06-17 | Acid Treatment | 993.00 | 996.00 | 0 |
1988-06-20 | Packing Device Capped w/Cement | 982.00 | 990.00 | 0 |
1988-06-20 | Perforation | 300.00 | 301.00 | 13 |
1988-06-20 | Remedial Casing Cementing | 300.00 | 301.00 | 0 |
1988-06-22 | Perforation | 926.00 | 931.00 | 13 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1988 | 336 | 0.0 | 0.0 | 0.0 |
1989 | 0 | 0.0 | 0.0 | 0.0 |
1990 | 0 | 0.0 | 0.0 | 0.0 |
1991 | 0 | 0.0 | 0.0 | 0.0 |
1992 | 0 | 0.0 | 0.0 | 0.0 |
1993 | 0 | 0.0 | 0.0 | 0.0 |
1994 | 0 | 0.0 | 0.0 | 0.0 |
1995 | 0 | 0.0 | 0.0 | 0.0 |
1996 | 0 | 0.0 | 0.0 | 0.0 |
1997 | 0 | 0.0 | 0.0 | 0.0 |
1998 | 0 | 0.0 | 0.0 | 0.0 |
1999 | 0 | 0.0 | 0.0 | 0.0 |
2000 | 0 | 0.0 | 0.0 | 0.0 |
2001 | 0 | 0.0 | 0.0 | 0.0 |
2002 | 0 | 0.0 | 0.0 | 0.0 |
2003 | 0 | 0.0 | 0.0 | 0.0 |
2004 | 0 | 0.0 | 0.0 | 0.0 |
2005 | 0 | 0.0 | 0.0 | 0.0 |
2006 | 0 | 0.0 | 0.0 | 0.0 |
2007 | 0 | 0.0 | 0.0 | 0.0 |
2008 | 0 | 0.0 | 0.0 | 0.0 |
2009 | 0 | 0.0 | 0.0 | 0.0 |
2010 | 0 | 0.0 | 0.0 | 0.0 |
2011 | 0 | 0.0 | 0.0 | 0.0 |
2012 | 0 | 0.0 | 0.0 | 0.0 |
2013 | 0 | 0.0 | 0.0 | 0.0 |
2014 | 0 | 0.0 | 0.0 | 0.0 |
2015 | 0 | 0.0 | 0.0 | 0.0 |
2016 | 0 | 0.0 | 0.0 | 0.0 |
2017 | 0 | 0.0 | 0.0 | 0.0 |
2018 | 0 | 0.0 | 0.0 | 0.0 |
2019 | 0 | 0.0 | 0.0 | 0.0 |
2020 | 0 | 0.0 | 0.0 | 0.0 |
For data sources see[6]