X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082103C02

Well Details

Well ID: 0204082103C02
Loading map...
Location: C0/03-21-020-08W4/2
Location Alias: C0/03-21-20-08 W4M
Location Alias 2: C0/03-21-020-08 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 3-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0133859
License Date: 1988-05-13
License Status: Issued
Spud Date: 1988-05-23
Final Drill Date: 1988-05-27
Well Total Depth: 1014.00 m
Surface Hole Latitude: 50.706541
Surface Hole Longitude: -111.058343

For data sources see[1][2]

Well History

Date Event
1988-05-13 Obtained License
1988-05-25 Surface Casing Operation Performed
1988-05-27 Finished Drilling
1988-05-27 Well Log Performed
1988-05-27 Well Mode changed to Drilled and Cased
1988-05-28 Drill Stem Test Performed
1988-05-29 Production Casing Operation Performed
1988-05-29 Rig Released
1988-06-02 Perforation Treatment Performed - Jet Perforation
1988-07-11 Perforation Treatment Performed - Jet Perforation
1990-04-07 Perforation Treatment Performed - Cement Squeeze
1990-04-07 Well Began Injection
1990-04-07 Well Fluid changed to Water
1990-04-07 Well Log Performed
1990-04-07 Well Type changed to Disposal
1990-04-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-04-08 Perforation Treatment Performed - Jet Perforation
1990-06-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1990-06-21 Perforation Treatment Performed - Jet Perforation
1990-06-21 Plug Back Performed
1990-06-21 Well Fluid changed to Water
1990-06-21 Well Mode changed to Abandoned Zone
1990-06-21 Well Type changed to Disposal
1990-06-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-04-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-04-23 Plug Back Performed
1994-04-25 Perforation Treatment Performed - Jet Perforation
1994-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-07-15 Perforation Treatment Performed - Jet Perforation
1994-07-15 Plug Back Performed
1994-10-26 Perforation Treatment Performed - Jet Perforation
1997-12-01 Perforation Treatment Performed - Cement Squeeze
1997-12-01 Plug Back Performed
1997-12-03 Perforation Treatment Performed - Jet Perforation
1997-12-05 Well Log Performed
1997-12-10 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-06-02 Perforation 929.00 930.00 13
1990-09-22 Acid Treatment 938.00 950.00 0
1994-04-23 Packing Device Capped w/Cement 925.00 933.00 0
1994-04-25 Perforation 766.00 770.00 13
1994-07-15 Packing Device Capped w/Cement 904.00 912.00 0
1994-07-15 Perforation 770.00 774.00 13
1994-10-26 Perforation 764.00 766.00 13
1997-12-01 Cement Squeeze 764.00 774.00 0
1997-12-03 Perforation 938.00 950.00 17
1988-06-02 Perforation 930.00 931.00 13
1988-07-11 Perforation 930.00 932.00 13
1990-04-07 Cement Squeeze 929.00 932.00 0
1990-04-08 Perforation 1002.00 1007.00 17
1990-04-08 Acid Treatment 1002.00 1007.00 0
1990-06-21 Packing Device Capped w/Cement 992.00 1000.00 0
1990-06-21 Perforation 938.00 950.00 17
1990-06-22 Acid Treatment 938.00 950.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 0 0.0 0.0 0.0

For data sources see[5]

References