X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204082102020

Well Details

Well ID: 0204082102020
Loading map...
Location: 02/02-21-020-08W4/0
Location Alias: 02/02-21-20-08 W4M
Location Alias 2: 02/02-21-020-08 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 08
Section: 21
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 2-21-20-8
Operator Name: Cardinal Energy Ltd.
License Number: 0129806
License Date: 1987-11-03
License Status: Issued
Spud Date: 1987-11-09
Final Drill Date: 1987-11-12
Well Total Depth: 1000.00 m
Surface Hole Latitude: 50.706405
Surface Hole Longitude: -111.053964

For data sources see[1][2]

Well History

Date Event
1987-11-03 Obtained License
1987-11-10 Surface Casing Operation Performed
1987-11-12 Finished Drilling
1987-11-12 Well Mode changed to Drilled and Cased
1987-11-13 Production Casing Operation Performed
1987-11-13 Rig Released
1987-11-13 Well Log Performed
1987-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1987-11-24 Perforation Treatment Performed - Jet Perforation
1987-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1987-11-25 Perforation Treatment Performed - Jet Perforation
1987-11-25 Plug Back Performed
1987-12-02 Well Began Production
1987-12-02 Well Fluid changed to Crude Oil
1987-12-02 Well Mode changed to Flowing
1988-06-13 Perforation Treatment Performed - Jet Perforation
1988-06-13 Well Fluid changed to Crude Oil
1988-06-13 Well Mode changed to Pumping
1988-06-14 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-06-14 Perforation Treatment Performed - Cement Squeeze
1988-06-17 Perforation Treatment Performed - Jet Perforation
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Suspended
1994-10-11 Perforation Treatment Performed - Cement Squeeze
1994-10-13 Perforation Treatment Performed - Jet Perforation
1994-10-14 Well Log Performed
1994-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-10-15 Perforation Treatment Performed - Jet Perforation
1994-10-15 Plug Back Performed
1994-10-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-12-08 Well Began Injection
1994-12-08 Well Fluid changed to Water
1994-12-08 Well Type changed to Disposal

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-11-24 Perforation 975.00 980.00 7
1994-10-13 Perforation 975.00 980.00 7
1994-10-15 Packing Device Capped w/Cement 963.00 971.00 0
1994-10-15 Perforation 937.00 947.00 13
1994-10-18 Acid Treatment 937.00 947.00 0
1987-11-24 Acid Treatment 975.00 980.00 0
1987-11-25 Packing Device Capped w/Cement 962.00 970.00 0
1987-11-25 Perforation 930.00 932.00 13
1988-06-13 Perforation 935.00 936.00 13
1988-06-14 Acid Treatment 935.00 936.00 0
1988-06-14 Cement Squeeze 930.00 936.00 0
1988-06-17 Perforation 930.00 932.00 13
1994-10-11 Cement Squeeze 930.00 932.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 687 0.0 0.0 0.0
1988 7819 0.0 0.0 0.0
1989 8584 0.0 0.0 0.0
1990 8257 0.0 0.0 0.0
1991 7380 0.0 0.0 0.0
1992 2387 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[5]

References