X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204073109030

Well Details

Well ID: 0204073109030
Loading map...
Location: 03/09-31-020-07W4/0
Location Alias: 03/09-31-20-07 W4M
Location Alias 2: 03/09-31-020-07 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 31
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 9-31-20-7
Operator Name: Cardinal Energy Ltd.
License Number: 0179278
License Date: 1995-07-14
License Status: Amended
Spud Date: 1995-07-16
Final Drill Date: 1995-07-23
Well Total Depth: 1350.00 m
Surface Hole Latitude: 50.740234
Surface Hole Longitude: -110.958972

For data sources see[1][2]

Well History

Date Event
1995-07-14 Obtained License
1995-07-17 Surface Casing Operation Performed
1995-07-19 Direction Drilling Operation Performed - Horizontal
1995-07-21 Production Casing Operation Performed
1995-07-22 Well Log Performed
1995-07-23 Finished Drilling
1995-07-23 Perforation Treatment Performed - Open-Hole Completion
1995-07-23 Well Mode changed to Drilled and Cased
1995-07-24 Rig Released
1995-07-27 Well Began Production
1995-07-27 Well Fluid changed to Gas
1995-07-27 Well Mode changed to Flowing
1995-07-28 Well Fluid changed to Crude Oil
1995-07-28 Well Mode changed to Pumping
1995-08-03 Well Log Performed
2010-08-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-11 Plug Back Performed
2010-08-11 Well Fluid changed to Crude Oil
2010-08-11 Well Log Performed
2010-08-11 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-19 780.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-07-23 Open Hole/Barefoot Completion 1073.00 1350.00 0
2010-08-11 Packing Device Capped w/Cement 865.00 880.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 3156 0.0 0.0 0.0
1996 6978 0.0 0.0 0.0
1997 8000 0.0 0.0 0.0
1998 8577 0.0 0.0 0.0
1999 8254 0.0 0.0 0.0
2000 8656 0.0 0.0 0.0
2001 8736 0.0 0.0 0.0
2002 8682 0.0 0.0 0.0
2003 8447 0.0 0.0 0.0
2004 3755 0.0 0.0 0.0
2006 2914 0.0 0.0 0.0
2007 6994 0.0 0.0 0.0
2008 5937 0.0 0.0 0.0
2009 7367 0.0 0.0 0.0
2010 5672 0.0 0.0 0.0

For data sources see[6]

References