X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204073108000

Well Details

Well ID: 0204073108000
Loading map...
Location: 00/08-31-020-07W4/0
Location Alias: 00/08-31-20-07 W4M
Location Alias 2: 00/08-31-020-07 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 31
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 8-31-20-7
Operator Name: Cardinal Energy Ltd.
License Number: 0226682
License Date: 1999-09-23
License Status: Suspension
Spud Date: 1999-10-09
Final Drill Date: 1999-10-16
Well Total Depth: 1139.00 m
Surface Hole Latitude: 50.737254
Surface Hole Longitude: -110.956162

For data sources see[1][2]

Well History

Date Event
1999-09-23 Obtained License
1999-10-10 Surface Casing Operation Performed
1999-10-12 Direction Drilling Operation Performed - Horizontal
1999-10-16 Finished Drilling
1999-10-17 Production Casing Operation Performed
1999-10-17 Rig Released
1999-10-17 Well Log Performed
1999-10-17 Well Mode changed to Drilled and Cased
1999-10-28 Well Log Performed
1999-11-01 Perforation Treatment Performed - Jet Perforation
1999-11-09 Well Began Production
1999-11-09 Well Fluid changed to Crude Oil
1999-11-09 Well Mode changed to Pumping
2005-10-30 Perforation Treatment Performed - Jet Perforation
2006-04-21 Perforation Treatment Performed - Jet Perforation
2006-04-21 Well Log Performed
2006-04-25 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-08-07 Well Fluid changed to Crude Oil
2008-08-07 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-10-12 766.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-11-01 Perforation 1125.00 1135.00 14
2005-10-30 Perforation 1125.00 1135.00 17
2006-04-21 Perforation 1100.00 1106.00 14
2006-04-21 Perforation 1110.40 1116.40 14
2006-04-21 Perforation 1120.80 1126.80 14
2006-04-25 Acid Treatment 1100.00 1135.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 1210 0.0 0.0 0.0
2000 8612 0.0 0.0 0.0
2001 8472 0.0 0.0 0.0
2002 8154 0.0 0.0 0.0
2003 7874 0.0 0.0 0.0
2004 4329 0.0 0.0 0.0
2005 4182 0.0 0.0 0.0
2006 40 0.0 0.0 0.0
2007 56 0.0 0.0 0.0

For data sources see[6]

References