If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
| Well ID: 0204072016002 | ![]() Sorry, we have no imagery here. Sorry, we have no imagery here. Sorry, we have no imagery here. ![]()  | 
| Location: 00/16-20-020-07W4/2 | |
| Location Alias: 00/16-20-20-07 W4M | |
| Location Alias 2: 00/16-20-020-07 W4/02 | |
| Country: Canada | |
| Province: Alberta | |
| Township: 020 | |
| Meridian: 4 | |
| Range: 07 | |
| Section: 20 | |
| County/Municipality: Special Areas No. 2 | |
| Well Name: CARDINAL SUFFIELD 15-20-20-7 | |
| Operator Name: Cardinal Energy Ltd. | |
| License Number: 0175573 | |
| License Date: 1995-01-31 | |
| License Status: Suspension | |
| Spud Date: 1995-02-09 | |
| Final Drill Date: 1995-02-19 | |
| Well Total Depth: 1388.00 m | |
| Surface Hole Latitude: 50.714242 | |
| Surface Hole Longitude: -110.938181 | 
| Date | Event | 
|---|---|
| 1995-01-31 | Obtained License | 
| 1995-02-10 | Surface Casing Operation Performed | 
| 1995-02-14 | Direction Drilling Operation Performed - Horizontal | 
| 1995-02-17 | Intermediate Casing Operation Performed | 
| 1995-02-19 | Finished Drilling | 
| 1995-02-19 | Perforation Treatment Performed - Open-Hole Completion | 
| 1995-02-19 | Rig Released | 
| 1995-02-19 | Well Mode changed to Drilled and Cased | 
| 1995-02-22 | Well Began Production | 
| 1995-02-22 | Well Fluid changed to Crude Oil | 
| 1995-02-22 | Well Mode changed to Pumping | 
| 1995-03-02 | Well Log Performed | 
| 2010-03-12 | Perforation Treatment Performed - Bridge Plug Capped W/Cement | 
| 2010-03-12 | Plug Back Performed | 
| 2010-03-12 | Well Fluid changed to Crude Oil | 
| 2010-03-12 | Well Mode changed to Abandoned and Whipstocked | 
For data sources see[3]
| Start Date | Depth (m) | Reason | 
|---|---|---|
| 1995-02-14 | 817.00 | Horizontal | 
For data sources see[4]
| Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots | 
|---|---|---|---|---|
| 1995-02-19 | Open Hole/Barefoot Completion | 996.00 | 1388.00 | 0 | 
| 2010-03-12 | Packing Device Capped w/Cement | 952.00 | 980.00 | 0 | 
For data sources see[5]
 
| Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) | 
|---|---|---|---|---|
| 1995 | 6227 | 0.0 | 0.0 | 0.0 | 
| 1996 | 8600 | 0.0 | 0.0 | 0.0 | 
| 1997 | 8490 | 0.0 | 0.0 | 0.0 | 
| 1998 | 8050 | 0.0 | 0.0 | 0.0 | 
| 1999 | 8193 | 0.0 | 0.0 | 0.0 | 
| 2000 | 7732 | 0.0 | 0.0 | 0.0 | 
| 2001 | 8400 | 0.0 | 0.0 | 0.0 | 
| 2002 | 8314 | 0.0 | 0.0 | 0.0 | 
| 2003 | 7727 | 0.0 | 0.0 | 0.0 | 
| 2004 | 7846 | 0.0 | 0.0 | 0.0 | 
| 2005 | 3220 | 0.0 | 0.0 | 0.0 | 
| 2006 | 5391 | 0.0 | 0.0 | 0.0 | 
| 2007 | 7993 | 0.0 | 0.0 | 0.0 | 
| 2008 | 8279 | 0.0 | 0.0 | 0.0 | 
| 2009 | 6809 | 0.0 | 0.0 | 0.0 | 
| 2010 | 1464 | 0.0 | 0.0 | 0.0 | 
For data sources see[6]