X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204072014020

Well Details

Well ID: 0204072014020
Loading map...
Location: 02/14-20-020-07W4/0
Location Alias: 02/14-20-20-07 W4M
Location Alias 2: 02/14-20-020-07 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 07
Section: 20
County/Municipality: Special Areas No. 2
Well Name: CARDINAL SUFFIELD 14-20-20-7
Operator Name: Cardinal Energy Ltd.
License Number: 0181615
License Date: 1995-10-24
License Status: Amended
Spud Date: 1995-11-13
Final Drill Date: 1995-11-22
Well Total Depth: 1363.00 m
Surface Hole Latitude: 50.713201
Surface Hole Longitude: -110.946664

For data sources see[1][2]

Well History

Date Event
1995-10-24 Obtained License
1995-11-14 Surface Casing Operation Performed
1995-11-16 Direction Drilling Operation Performed - Horizontal
1995-11-18 Production Casing Operation Performed
1995-11-22 Finished Drilling
1995-11-22 Perforation Treatment Performed - Open-Hole Completion
1995-11-22 Well Mode changed to Drilled and Cased
1995-11-23 Rig Released
1995-11-28 Well Log Performed
1995-11-29 Well Began Production
1995-11-29 Well Fluid changed to Crude Oil
1995-11-29 Well Mode changed to Pumping
2000-09-15 Well Fluid changed to Crude Oil
2000-09-15 Well Mode changed to Suspended
2005-11-23 Well Fluid changed to Crude Oil
2005-11-23 Well Mode changed to Pumping
2009-10-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-10-07 Plug Back Performed
2009-10-07 Well Fluid changed to Crude Oil
2009-10-07 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-11-16 806.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-11-22 Open Hole/Barefoot Completion 1049.00 1363.00 0
2009-10-07 Packing Device Capped w/Cement 966.60 1040.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 780 0.0 0.0 0.0
1996 8439 0.0 0.0 0.0
1997 8552 0.0 0.0 0.0
1998 8677 0.0 0.0 0.0
1999 7080 0.0 0.0 0.0
2000 2638 0.0 0.0 0.0
2005 528 0.0 0.0 0.0
2006 7094 0.0 0.0 0.0
2007 8549 0.0 0.0 0.0
2008 2207 0.0 0.0 0.0

For data sources see[6]

References