X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204063616002

Well Details

Well ID: 0204063616002
Loading map...
Location: 00/16-36-020-06W4/2
Location Alias: 00/16-36-20-06 W4M
Location Alias 2: 00/16-36-020-06 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 36
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 16-36-20-6
Operator Name: Ridgeback Resources Inc.
License Number: 0096220
License Date: 1982-06-10
License Status: Abandoned
Spud Date: 1982-07-11
Final Drill Date: 1982-07-13
Well Total Depth: 595.00 m
Surface Hole Latitude: 50.746428
Surface Hole Longitude: -110.697904

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1982-06-10 Obtained License
1982-07-13 Finished Drilling
1982-07-13 Production Casing Operation Performed
1982-07-13 Well Mode changed to Drilled and Cased
1982-07-25 Perforation Treatment Performed - Jet Perforation
1982-08-01 Perforation Treatment Performed - Fractured
2001-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-08-28 Plug Back Performed
2001-08-28 Well Log Performed
2001-08-30 Perforation Treatment Performed - Jet Perforation
2001-08-30 Well Log Performed
2001-09-10 Perforation Treatment Performed - Fractured
2001-09-11 Well Began Production
2001-09-11 Well Fluid changed to Gas
2001-09-11 Well Mode changed to Flowing
2009-06-01 Well Fluid changed to Gas
2009-06-01 Well Mode changed to Suspended
2017-11-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-02 Plug Back Performed
2017-11-02 Well Abandoned
2017-11-02 Well Fluid changed to Gas
2017-11-02 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1982-07-25 Perforation 505.50 509.00 11
1982-08-01 Fracture 505.50 509.00 0
2001-08-28 Packing Device Capped w/Cement 490.00 498.00 0
2001-08-30 Perforation 440.50 448.50 13
2001-09-10 Fracture 440.50 448.50 0
2017-11-02 Packing Device Capped w/Cement 426.00 434.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 936 0.0 0.0 0.0
2002 528 0.0 0.0 0.0
2003 504 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-02 No Incident Encountered 0.00 0.00

For data sources see[6]

References