X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204062606000

Well Details

Well ID: 0204062606000
Loading map...
Location: 00/06-26-020-06W4/0
Location Alias: 00/06-26-20-06 W4M
Location Alias 2: 00/06-26-020-06 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 26
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 6-26-20-6
Operator Name: Ridgeback Resources Inc.
License Number: 0038874
License Date: 1970-09-28
License Status: Suspension
Spud Date: 1970-09-28
Final Drill Date: 1970-10-01
Well Total Depth: 559.30 m
Surface Hole Latitude: 50.721829
Surface Hole Longitude: -110.736183

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1970-09-28 Obtained License
1970-10-01 Finished Drilling
1970-10-01 Production Casing Operation Performed
1970-10-01 Well Mode changed to Drilled and Cased
1970-10-16 Perforation Treatment Performed - Jet Perforation
1970-10-19 Perforation Treatment Performed - Fractured
1970-11-30 Well Began Production
1970-11-30 Well Fluid changed to Gas
1970-11-30 Well Mode changed to Flowing
2004-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-04-01 Perforation Treatment Performed - Jet Perforation
2004-04-01 Plug Back Performed
2004-04-01 Well Fluid changed to Gas
2004-04-01 Well Log Performed
2004-04-01 Well Mode changed to Abandoned Zone
2004-04-02 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1970-10-16 Perforation 524.90 529.10 13
2004-04-02 Fracture 463.50 466.50 0
2004-04-02 Fracture 446.50 448.50 0
2004-04-02 Fracture 424.00 426.00 0
2004-04-02 Fracture 399.00 401.00 0
1970-10-19 Fracture 524.90 529.10 0
2004-04-01 Packing Device Capped w/Cement 512.00 520.00 0
2004-04-01 Perforation 473.00 476.00 7
2004-04-01 Perforation 463.50 466.50 7
2004-04-01 Perforation 446.50 448.50 7
2004-04-01 Perforation 424.00 426.00 7
2004-04-01 Perforation 399.00 401.00 7
2004-04-02 Fracture 473.00 476.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1970 701 0.0 0.0 0.0
1971 8036 0.0 0.0 0.0
1972 8656 0.0 0.0 0.0
1973 8652 0.0 0.0 0.0
1974 7671 0.0 0.0 0.0
1975 8463 0.0 0.0 0.0
1976 8615 0.0 0.0 0.0
1977 6710 0.0 0.0 0.0
1978 5709 0.0 0.0 0.0
1979 8285 0.0 0.0 0.0
1980 5390 0.0 0.0 0.0
1981 3894 0.0 0.0 0.0
1982 8026 0.0 0.0 0.0
1983 6121 0.0 0.0 0.0
1984 7945 0.0 0.0 0.0
1985 3833 0.0 0.0 0.0
1986 2169 0.0 0.0 0.0
1987 6002 0.0 0.0 0.0
1988 5250 0.0 0.0 0.0
1989 3813 0.0 0.0 0.0
1990 5852 0.0 0.0 0.0
1991 5158 0.0 0.0 0.0
1992 8343 0.0 0.0 0.0
1993 8565 0.0 0.0 0.0
1994 8472 0.0 0.0 0.0
1995 8726 0.0 0.0 0.0
1996 8684 0.0 0.0 0.0
1997 8689 0.0 0.0 0.0
1998 8311 0.0 0.0 0.0
1999 8759 0.0 0.0 0.0
2000 8783 0.0 0.0 0.0
2001 8615 0.0 0.0 0.0
2002 8711 0.0 0.0 0.0
2003 8759 0.0 0.0 0.0
2004 1680 0.0 0.0 0.0

For data sources see[5]

References