X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204062407002

Well Details

Well ID: 0204062407002
Loading map...
Location: 00/07-24-020-06W4/2
Location Alias: 00/07-24-20-06 W4M
Location Alias 2: 00/07-24-020-06 W4/02
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 06
Section: 24
County/Municipality: Special Areas No. 2
Well Name: RIDGEBACK ATL-BUFF 7-24-20-6
Operator Name: Ridgeback Resources Inc.
License Number: 0036725
License Date: 1969-08-20
License Status: Suspension
Spud Date: 1969-09-14
Final Drill Date: 1969-09-16
Well Total Depth: 555.30 m
Surface Hole Latitude: 50.708657
Surface Hole Longitude: -110.705196

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-08-20 Obtained License
1969-09-16 Finished Drilling
1969-09-16 Production Casing Operation Performed
1969-09-16 Well Mode changed to Drilled and Cased
1969-09-27 Perforation Treatment Performed - Jet Perforation
1969-09-28 Perforation Treatment Performed - Fractured
2002-09-16 Perforation Treatment Performed - Jet Perforation
2002-09-16 Well Log Performed
2002-09-19 Perforation Treatment Performed - Fractured
2002-09-20 Perforation Treatment Performed - Jet Perforation
2002-09-20 Well Log Performed
2002-09-23 Perforation Treatment Performed - Fractured
2002-09-27 Well Structure changed to Commingled
2006-02-05 Well Began Production
2006-02-05 Well Fluid changed to Gas
2006-02-05 Well Mode changed to Flowing
2006-02-06 Well Fluid changed to Gas
2006-02-06 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-09-27 Perforation 522.10 525.50 13
2002-09-23 Fracture 449.00 453.50 0
2002-09-23 Fracture 442.00 444.00 0
2002-09-23 Fracture 433.00 439.00 0
1969-09-28 Fracture 522.10 525.50 0
2002-09-16 Perforation 522.10 525.50 13
2002-09-19 Fracture 522.10 525.50 0
2002-09-20 Perforation 457.00 467.00 13
2002-09-20 Perforation 449.00 453.50 13
2002-09-20 Perforation 442.00 444.00 13
2002-09-20 Perforation 433.00 439.00 13
2002-09-23 Fracture 457.00 467.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2006 24 0.0 0.0 0.0

For data sources see[5]

References