X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204032106000

Well Details

Well ID: 0204032106000
Loading map...
Location: 00/06-21-020-03W4/0
Location Alias: 00/06-21-20-03 W4M
Location Alias 2: 00/06-21-020-03 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 03
Section: 21
County/Municipality: Special Areas No. 2
Well Name: ACTION ATLEE 6-21-20-3
Operator Name: Canadian Natural Resources Limited
License Number: 0066124
License Date: 1977-10-12
License Status: Abandoned
Spud Date: 1977-10-14
Final Drill Date: 1977-10-15
Well Total Depth: 467.60 m
Surface Hole Latitude: 50.707134
Surface Hole Longitude: -110.368053

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-10-12 Obtained License
1977-10-15 Finished Drilling
1977-10-15 Production Casing Operation Performed
1977-10-15 Well Mode changed to Drilled and Cased
1977-11-05 Perforation Treatment Performed - Jet Perforation
1977-12-20 Perforation Treatment Performed - Fractured
1977-12-23 Well Began Production
1977-12-23 Well Fluid changed to Gas
1977-12-23 Well Mode changed to Flowing
1978-01-06 Perforation Treatment Performed - Selective Jet Perforations
1978-01-07 Perforation Treatment Performed - Fractured
2002-06-04 Perforation Treatment Performed - Fractured
2014-07-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2014-07-04 Plug Back Performed
2014-07-04 Well Fluid changed to Gas
2014-07-04 Well Mode changed to Abandoned Zone
2014-08-29 Well Abandoned
2014-08-29 Well Fluid changed to Gas
2014-08-29 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-11-05 Perforation 437.70 440.10 7
1978-01-06 Selective Jet Perforations 388.00 388.00 0
1978-01-07 Fracture 350.20 388.00 0
2002-06-04 Fracture 350.20 351.40 0
2002-06-04 Fracture 354.50 357.20 0
2002-06-04 Fracture 358.70 359.40 0
2002-06-04 Fracture 361.80 373.10 0
2002-06-04 Fracture 373.70 374.30 0
2002-06-04 Fracture 374.90 375.50 0
2002-06-04 Fracture 378.00 385.90 0
2002-06-04 Fracture 388.00 388.00 0
1977-12-20 Fracture 437.70 440.10 0
2014-07-04 Packing Device Capped w/Cement 424.00 432.00 0
2014-07-04 Packing Device Capped w/Cement 336.00 344.00 0
1978-01-06 Selective Jet Perforations 350.20 351.40 0
1978-01-06 Selective Jet Perforations 354.50 357.20 0
1978-01-06 Selective Jet Perforations 358.70 359.40 0
1978-01-06 Selective Jet Perforations 361.80 373.10 0
1978-01-06 Selective Jet Perforations 373.70 374.30 0
1978-01-06 Selective Jet Perforations 374.90 375.50 0
1978-01-06 Selective Jet Perforations 378.00 385.90 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 216 0.0 0.0 0.0
1978 7233 0.0 0.0 0.0
1979 5790 0.0 0.0 0.0
1980 6835 0.0 0.0 0.0
1981 7837 0.0 0.0 0.0
1982 6774 0.0 0.0 0.0
1983 5280 0.0 0.0 0.0
1984 7277 0.0 0.0 0.0
1985 7337 0.0 0.0 0.0
1986 3709 0.0 0.0 0.0
1987 5431 0.0 0.0 0.0
1988 5043 0.0 0.0 0.0
1989 7020 0.0 0.0 0.0
1990 2126 0.0 0.0 0.0
1991 47 0.0 0.0 0.0
1992 6958 0.0 0.0 0.0
1993 8149 0.0 0.0 0.0
1994 8701 0.0 0.0 0.0
1995 8700 0.0 0.0 0.0
1996 8711 0.0 0.0 0.0
1997 8648 0.0 0.0 0.0
1998 8282 0.0 0.0 0.0
1999 8692 0.0 0.0 0.0
2000 8528 0.0 0.0 0.0
2001 7736 0.0 0.0 0.0
2002 8041 0.0 0.0 0.0
2003 8106 0.0 0.0 0.0
2004 8761 0.0 0.0 0.0
2005 8741 0.0 0.0 0.0
2006 8749 0.0 0.0 0.0
2007 4342 0.0 0.0 0.0
2008 1896 0.0 0.0 0.0
2009 8612 0.0 0.0 0.0
2010 8715 0.0 0.0 0.0
2011 8738 0.0 0.0 0.0
2012 8599 0.0 0.0 0.0
2013 8751 0.0 0.0 0.0
2014 2855 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2014-07-04 No Incident Encountered 0.00 0.00

For data sources see[6]

References