X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0204031916000

Well Details

Well ID: 0204031916000
Loading map...
Location: 00/16-19-020-03W4/0
Location Alias: 00/16-19-20-03 W4M
Location Alias 2: 00/16-19-020-03 W4/00
Country: Canada
Province: Alberta
Township: 020
Meridian: 4
Range: 03
Section: 19
County/Municipality: Special Areas No. 2
Well Name: NCO ATLEE 16-19-20-3
Operator Name: Area 2 Energy Ltd.
License Number: 0059143
License Date: 1976-07-14
License Status: Issued
Spud Date: 1976-07-19
Final Drill Date: 1976-07-20
Well Total Depth: 463.30 m
Surface Hole Latitude: 50.714403
Surface Hole Longitude: -110.397978

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-07-14 Obtained License
1976-07-20 Finished Drilling
1976-07-20 Production Casing Operation Performed
1976-07-20 Well Mode changed to Drilled and Cased
1976-09-01 Perforation Treatment Performed - Jet Perforation
1976-09-08 Perforation Treatment Performed - Fractured
1976-11-03 Well Began Production
1976-11-03 Well Fluid changed to Gas
1976-11-03 Well Mode changed to Flowing
1984-06-08 Well Log Performed
1985-11-04 Perforation Treatment Performed - Jet Perforation
1985-11-04 Well Fluid changed to Gas
1985-11-04 Well Mode changed to Flowing
1985-11-05 Perforation Treatment Performed - Fractured
1998-11-01 Well Fluid changed to Gas
1998-11-01 Well Mode changed to Suspended
1998-11-02 Well Fluid changed to Gas
1998-11-02 Well Mode changed to Suspended
1998-11-24 Perforation Treatment Performed - Fractured
1998-11-24 Perforation Treatment Performed - Jet Perforation
2007-06-12 Well Structure changed to Commingled

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-09-01 Perforation 428.20 431.60 13
1976-09-08 Fracture 428.20 431.60 0
1985-11-04 Perforation 364.00 367.00 4
1985-11-05 Fracture 364.00 367.00 0
1998-11-24 Perforation 341.00 343.00 4
1998-11-24 Perforation 348.50 350.50 4
1998-11-24 Perforation 358.00 359.50 4
1998-11-24 Fracture 341.00 359.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 1219 0.0 0.0 0.0
1977 8478 0.0 0.0 0.0
1978 8402 0.0 0.0 0.0
1979 8565 0.0 0.0 0.0
1980 8602 0.0 0.0 0.0
1981 8527 0.0 0.0 0.0
1982 8357 0.0 0.0 0.0
1983 8707 0.0 0.0 0.0
1984 8696 0.0 0.0 0.0
1985 8750 0.0 0.0 0.0
1986 8725 0.0 0.0 0.0
1987 8742 0.0 0.0 0.0
1988 8779 0.0 0.0 0.0
1989 8037 0.0 0.0 0.0
1990 7370 0.0 0.0 0.0
1991 8738 0.0 0.0 0.0
1992 8192 0.0 0.0 0.0
1993 7984 0.0 0.0 0.0
1994 8708 0.0 0.0 0.0
1995 8643 0.0 0.0 0.0
1996 8508 0.0 0.0 0.0
1997 8097 0.0 0.0 0.0
1998 6388 0.0 0.0 0.0

For data sources see[5]

References