X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195021813000

Well Details

Well ID: 0195021813000
Loading map...
Location: 00/13-18-019-02W5/0
Location Alias: 00/13-18-19-02 W5M
Location Alias 2: 00/13-18-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 18
County/Municipality: Foothills County
Well Name: CANERA OKALTA 9 TV 13-18-19-2
Operator Name: Legacy Oil + Gas Inc.
License Number: B0000092
License Date: 1940-01-15
License Status: RecCertified
Spud Date: 1940-03-04
Final Drill Date: 1940-09-23
Well Total Depth: 2429.60 m
Surface Hole Latitude: 50.613550
Surface Hole Longitude: -114.275698

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1940-01-15 Obtained License
1940-09-01 Production Casing Operation Performed
1940-09-23 Finished Drilling
1940-09-23 Perforation Treatment Performed - Open-Hole Completion
1940-09-23 Well Mode changed to Drilled and Cased
1940-09-24 Well Began Production
1940-09-24 Well Fluid changed to Crude Oil
1940-09-24 Well Mode changed to Flowing
1940-09-28 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-01 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-06 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-16 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-23 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-24 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-27 Perforation Treatment Performed - Acid Wash - No Pressure
1940-10-29 Perforation Treatment Performed - Acid Wash - No Pressure
1940-11-05 Perforation Treatment Performed - Acid Wash - No Pressure
1967-08-16 Well Began Injection
1967-08-16 Well Fluid changed to Water
1967-08-16 Well Type changed to Injection
2002-05-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-06 Perforation Treatment Performed - Cement Plug
2002-05-06 Perforation Treatment Performed - Cement Squeeze
2002-05-06 Plug Back Performed
2002-05-06 Well Fluid changed to Water
2002-05-06 Well Mode changed to Abandoned Zone
2002-05-06 Well Type changed to Injection
2002-05-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-12 Perforation Treatment Performed - Cement Plug
2002-05-12 Perforation Treatment Performed - Jet Perforation
2002-05-12 Perforation Treatment Performed - Remedial Casing
2002-05-15 Perforation Treatment Performed - Jet Perforation
2002-05-15 Well Log Performed
2002-05-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2002-05-16 Perforation Treatment Performed - Cement Plug
2002-05-16 Perforation Treatment Performed - Remedial Casing
2002-05-16 Plug Back Performed
2002-08-15 Well Abandoned
2002-08-15 Well Fluid changed to Water
2002-08-15 Well Mode changed to Abandoned
2002-08-15 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-09-23 Open Hole/Barefoot Completion 2305.20 2429.60 0
1940-11-05 Acid Wash 2328.70 2353.10 0
2002-05-06 Cement Squeeze 2305.20 2349.00 0
2002-05-06 Cement Plug 2292.50 2349.00 0
2002-05-06 Packing Device Capped w/Cement 2228.50 2292.00 0
2002-05-12 Perforation 695.70 696.30 99
2002-05-12 Remedial Casing Cementing 695.70 696.30 0
2002-05-12 Cement Plug 690.40 696.30 0
2002-05-12 Packing Device Capped w/Cement 608.00 689.90 0
2002-05-15 Perforation 600.00 601.00 14
2002-05-16 Remedial Casing Cementing 600.00 601.00 0
1940-09-28 Acid Wash 2328.70 2421.60 0
2002-05-16 Cement Plug 594.50 601.00 0
2002-05-16 Packing Device Capped w/Cement 517.50 594.00 0
1940-10-01 Acid Wash 2328.70 2353.10 0
1940-10-06 Acid Wash 2328.70 2353.10 0
1940-10-16 Acid Wash 2305.20 2429.60 0
1940-10-23 Acid Wash 2417.10 2421.60 0
1940-10-24 Acid Wash 2417.10 2421.60 0
1940-10-27 Acid Wash 2328.70 2353.10 0
1940-10-29 Acid Wash 2328.70 2353.10 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0

For data sources see[5]

References