X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020608000

Well Details

Well ID: 0195020608000
Loading map...
Location: 00/08-06-019-02W5/0
Location Alias: 00/08-06-19-02 W5M
Location Alias 2: 00/08-06-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 06
County/Municipality: Foothills County
Well Name: CPEC E. CREST 4 TV 8-6-19-2
Operator Name: Crescent Point Energy Corp.
License Number: A0000173
License Date: 1938-03-19
License Status: Amended
Spud Date: 1938-03-21
Final Drill Date: 1939-05-09
Well Total Depth: 2450.60 m
Surface Hole Latitude: 50.577019
Surface Hole Longitude: -114.257956

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1938-03-19 Obtained License
1939-04-17 Production Casing Operation Performed
1939-05-09 Finished Drilling
1939-05-09 Well Mode changed to Drilled and Cased
1939-05-11 Perforation Treatment Performed - Open-Hole Completion
1939-05-15 Perforation Treatment Performed - Acid Wash - No Pressure
1939-05-15 Well Began Production
1939-05-15 Well Fluid changed to Crude Oil
1939-05-15 Well Mode changed to Flowing
1939-05-21 Perforation Treatment Performed - Acid Wash - No Pressure
1939-05-29 Perforation Treatment Performed - Acid Wash - No Pressure
1939-06-05 Perforation Treatment Performed - Acid Wash - No Pressure
1995-08-08 Well Log Performed
1995-08-10 Perforation Treatment Performed - Chemical Squeeze
1995-08-11 Perforation Treatment Performed - Acid Squeeze - Press Used
1998-05-28 Well Log Performed
1998-05-31 Perforation Treatment Performed - Cement Plug
1998-05-31 Plug Back Performed
1998-06-01 Perforation Treatment Performed - Cement Plug
1998-06-01 Plug Back Performed
1998-06-01 Well Fluid changed to Crude Oil
1998-06-01 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-05-11 Open Hole/Barefoot Completion 2316.50 2450.60 0
1939-05-15 Acid Wash 2316.50 2450.60 0
1939-05-21 Acid Wash 2316.50 2450.60 0
1939-05-29 Acid Wash 2316.50 2450.60 0
1939-06-05 Acid Wash 2316.50 2450.60 0
1995-08-10 Chemical Squeeze 2316.50 2450.60 0
1995-08-11 Acid Treatment 2316.50 2450.60 0
1998-05-31 Cement Plug 2340.50 2450.60 0
1998-06-01 Cement Plug 2238.30 2340.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 748 0.0 0.0 0.0
1968 7726 0.0 0.0 0.0
1969 8348 0.0 0.0 0.0
1970 8735 0.0 0.0 0.0
1971 8632 0.0 0.0 0.0
1972 7771 0.0 0.0 0.0
1973 7963 0.0 0.0 0.0
1974 8207 0.0 0.0 0.0
1975 6989 0.0 0.0 0.0
1976 7060 0.0 0.0 0.0
1977 6192 0.0 0.0 0.0
1980 180 0.0 0.0 0.0
1981 649 0.0 0.0 0.0
1982 552 0.0 0.0 0.0
1991 7177 0.0 0.0 0.0
1992 8580 0.0 0.0 0.0
1993 8280 0.0 0.0 0.0
1994 8291 0.0 0.0 0.0
1995 8067 0.0 0.0 0.0
1996 8770 0.0 0.0 0.0
1997 8538 0.0 0.0 0.0
1998 3207 0.0 0.0 0.0

For data sources see[5]

References