X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0195020513000

Well Details

Well ID: 0195020513000
Loading map...
Location: 00/13-05-019-02W5/0
Location Alias: 00/13-05-19-02 W5M
Location Alias 2: 00/13-05-019-02 W5/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 5
Range: 02
Section: 05
County/Municipality: Foothills County
Well Name: CPEC ROYALITE 51 TV 13-5-19-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000091
License Date: 1939-12-28
License Status: Issued
Spud Date: 1940-02-15
Final Drill Date: 1940-06-17
Well Total Depth: 2259.50 m
Surface Hole Latitude: 50.584729
Surface Hole Longitude: -114.252787

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-12-28 Obtained License
1940-06-01 Production Casing Operation Performed
1940-06-17 Finished Drilling
1940-06-17 Perforation Treatment Performed - Bullet Perforation
1940-06-17 Well Mode changed to Drilled and Cased
1940-06-18 Well Began Production
1940-06-18 Well Fluid changed to Crude Oil
1940-06-18 Well Mode changed to Flowing
1940-06-19 Perforation Treatment Performed - Acid Wash - No Pressure
1940-06-22 Perforation Treatment Performed - Acid Wash - No Pressure
1940-06-25 Perforation Treatment Performed - Acid Wash - No Pressure
1940-07-02 Perforation Treatment Performed - Acid Wash - No Pressure
1999-10-12 Well Fluid changed to Crude Oil
1999-10-12 Well Mode changed to Pumping
2003-03-01 Well Fluid changed to Crude Oil
2003-03-01 Well Mode changed to Suspended
2003-12-13 Perforation Treatment Performed - Bridge Plug No Cement Required
2010-09-29 Well Log Performed
2010-10-03 Liner Casing Operation Performed
2010-10-17 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-17 Perforation Treatment Performed - Fractured
2010-10-18 Perforation Treatment Performed - Abrasa-Jet Perforation
2010-10-18 Perforation Treatment Performed - Fractured
2010-12-05 Well Fluid changed to Crude Oil
2010-12-05 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1940-06-17 Bullet Perforation 2128.70 2259.50 0
2010-10-18 Fracture 2181.90 2182.10 0
2010-10-18 Hydra Jet Perforation 2167.40 2167.60 4
2010-10-18 Fracture 2167.40 2167.60 0
1940-06-19 Acid Wash 2128.70 2259.50 0
1940-06-22 Acid Wash 2128.70 2259.50 0
1940-06-25 Acid Wash 2128.70 2259.50 0
1940-07-02 Acid Wash 2128.70 2259.50 0
2003-12-13 Bridge Plug, No Cement 2119.00 2119.50 0
2010-10-17 Hydra Jet Perforation 2239.40 2239.60 4
2010-10-17 Fracture 2239.40 2239.60 0
2010-10-18 Hydra Jet Perforation 2181.90 2182.10 4

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1977 3839 0.0 0.0 0.0
1978 3095 0.0 0.0 0.0
1988 726 0.0 0.0 0.0
1990 721 0.0 0.0 0.0
1991 24 0.0 0.0 0.0
2010 451 0.0 0.0 0.0
2011 7008 0.0 0.0 0.0
2012 7093 0.0 0.0 0.0
2013 8453 0.0 0.0 0.0
2014 8573 0.0 0.0 0.0
2015 8181 0.0 0.0 0.0
2016 8183 0.0 0.0 0.0
2017 7938 0.0 0.0 0.0
2018 8642 0.0 0.0 0.0
2019 7152 0.0 0.0 0.0
2020 2017 0.0 0.0 0.0

For data sources see[5]

References