X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194263410000

Well Details

Well ID: 0194263410000
Loading map...
Location: 00/10-34-019-26W4/0
Location Alias: 00/10-34-19-26 W4M
Location Alias 2: 00/10-34-019-26 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 26
Section: 34
County/Municipality: Foothills County
Well Name: KFOCC HERRONTON 10-34-19-26
Operator Name: Kaiser-Francis Oil Company Of Canada
License Number: 0046071
License Date: 1973-06-07
License Status: RecCertified
Spud Date: 1973-06-08
Final Drill Date: 1973-06-25
Well Total Depth: 2011.70 m
Surface Hole Latitude: 50.655537
Surface Hole Longitude: -113.520035

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-06-07 Obtained License
1973-06-13 Drill Stem Test Performed
1973-06-14 Drill Stem Test Performed
1973-06-25 Finished Drilling
1973-06-26 Drill Stem Test Performed
1973-06-27 Drill Stem Test Performed
1973-06-28 Drill Stem Test Performed
1973-06-29 Drill Stem Test Performed
1973-07-01 Production Casing Operation Performed
1973-07-01 Well Mode changed to Drilled and Cased
1975-05-29 Perforation Treatment Performed - Jet Perforation
1975-06-02 Perforation Treatment Performed - Fractured
1975-07-22 Perforation Treatment Performed - Cement Squeeze
1975-07-26 Perforation Treatment Performed - Jet Perforation
1979-02-09 Well Began Production
1979-02-09 Well Fluid changed to Gas
1979-02-09 Well Mode changed to Flowing
1999-08-24 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-08-24 Perforation Treatment Performed - Jet Perforation
1999-08-24 Plug Back Performed
1999-08-24 Well Log Performed
1999-08-25 Perforation Treatment Performed - Remedial Casing
1999-09-04 Well Abandoned
1999-09-04 Well Fluid changed to Gas
1999-09-04 Well Mode changed to Abandoned
2001-12-13 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1975-05-29 Perforation 1060.70 1063.80 7
1975-06-02 Fracture 1060.70 1063.80 0
1975-07-22 Cement Squeeze 1060.70 1063.80 0
1975-07-26 Perforation 1060.70 1063.80 3
1999-08-24 Packing Device Capped w/Cement 1044.00 1052.00 0
1999-08-24 Perforation 422.70 423.00 18
1999-08-25 Remedial Casing Cementing 422.70 423.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 5799 0.0 0.0 0.0
1980 7119 0.0 0.0 0.0
1981 7242 0.0 0.0 0.0
1982 7333 0.0 0.0 0.0
1983 7424 0.0 0.0 0.0
1984 6594 0.0 0.0 0.0
1985 6001 0.0 0.0 0.0
1986 168 0.0 0.0 0.0

For data sources see[5]

References