X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194232210000

Well Details

Well ID: 0194232210000
Loading map...
Location: 00/10-22-019-23W4/0
Location Alias: 00/10-22-19-23 W4M
Location Alias 2: 00/10-22-019-23 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 23
Section: 22
County/Municipality: Vulcan County
Well Name: AMOCO MILO 10-22-19-23
Operator Name: ConocoPhillips Canada Resources Corp.
License Number: 0060954
License Date: 1976-11-03
License Status: RecCertified
Spud Date: 1976-11-18
Final Drill Date: 1976-12-13
Well Total Depth: 1841.00 m
Surface Hole Latitude: 50.626536
Surface Hole Longitude: -113.105530

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1976-11-03 Obtained License
1976-12-13 Finished Drilling
1976-12-16 Production Casing Operation Performed
1977-03-02 Perforation Treatment Performed - Jet Perforation
1977-03-03 Perforation Treatment Performed - Jet Perforation
1977-03-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-03-06 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1977-03-06 Perforation Treatment Performed - Jet Perforation
1977-03-07 Perforation Treatment Performed - Acid Squeeze - Press Used
1977-05-26 Perforation Treatment Performed - Fractured
1981-05-26 Well Mode changed to Drilled and Cased
1993-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-07-28 Perforation Treatment Performed - Jet Perforation
1993-07-28 Plug Back Performed
1993-07-28 Well Fluid changed to Gas
1993-07-28 Well Log Performed
1993-07-28 Well Mode changed to Testing
1993-07-29 Perforation Treatment Performed - Remedial Casing
1993-07-29 Well Fluid changed to Gas
1993-07-29 Well Mode changed to Abandoned
1993-08-22 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-03-02 Perforation 1777.60 1779.10 13
1993-07-29 Remedial Casing Cementing 471.00 471.80 0
1977-03-03 Perforation 1778.20 1779.70 10
1977-03-04 Acid Treatment 1777.60 1779.70 0
1977-03-06 Packing Device Capped w/Cement 1758.70 1758.70 7
1977-03-06 Perforation 1509.70 1513.30 7
1977-03-07 Acid Treatment 1509.70 1513.30 0
1977-05-26 Fracture 1509.70 1513.30 0
1993-07-28 Packing Device Capped w/Cement 1482.50 1490.50 0
1993-07-28 Perforation 471.00 471.80 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 48 0.0 0.0 0.0

For data sources see[5]

References