X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194180915000

Well Details

Well ID: 0194180915000
Loading map...
Location: 00/15-09-019-18W4/0
Location Alias: 00/15-09-19-18 W4M
Location Alias 2: 00/15-09-019-18 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 18
Section: 09
County/Municipality: Vulcan County
Well Name: CITY OF MEDH EYREMORE 15-9-19-18
Operator Name: City Of Medicine Hat
License Number: 0290497
License Date: 2003-07-28
License Status: Issued
Spud Date: 2003-08-29
Final Drill Date: 2003-08-30
Well Total Depth: 702.00 m
Surface Hole Latitude: 50.597954
Surface Hole Longitude: -112.437392

For data sources see[1][2]

Well History

Date Event
2003-07-28 Obtained License
2003-08-29 Surface Casing Operation Performed
2003-08-30 Finished Drilling
2003-08-30 Production Casing Operation Performed
2003-08-30 Rig Released
2003-08-30 Well Mode changed to Drilled and Cased
2003-09-04 Well Log Performed
2003-09-06 Perforation Treatment Performed - Jet Perforation
2003-09-07 Perforation Treatment Performed - Fractured
2003-09-10 Perforation Treatment Performed - Jet Perforation
2003-09-25 Perforation Treatment Performed - Fractured
2003-09-25 Perforation Treatment Performed - Jet Perforation
2003-09-28 Perforation Treatment Performed - Jet Perforation
2003-09-29 Perforation Treatment Performed - Fractured
2003-10-02 Perforation Treatment Performed - Jet Perforation
2003-10-03 Perforation Treatment Performed - Fractured
2003-12-16 Well Began Production
2003-12-16 Well Fluid changed to Gas
2003-12-16 Well Mode changed to Flowing

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2003-09-06 Perforation 636.00 640.00 13
2003-10-02 Perforation 502.00 510.00 7
2003-10-02 Perforation 522.00 530.00 7
2003-10-03 Fracture 502.00 530.00 0
2003-09-06 Perforation 647.00 650.00 13
2003-09-07 Fracture 636.00 650.00 0
2003-09-10 Perforation 625.00 631.00 13
2003-09-25 Perforation 625.00 631.00 7
2003-09-25 Fracture 625.00 631.00 0
2003-09-28 Perforation 543.00 548.00 7
2003-09-28 Perforation 557.00 563.00 7
2003-09-29 Fracture 543.00 563.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2003 369 0.0 0.0 0.0
2004 8695 0.0 0.0 0.0
2005 8664 0.0 0.0 0.0
2006 8610 0.0 0.0 0.0
2007 8666 0.0 0.0 0.0
2008 8592 0.0 0.0 0.0
2009 8594 0.0 0.0 0.0
2010 8532 0.0 0.0 0.0
2011 8572 0.0 0.0 0.0
2012 7550 0.0 0.0 0.0
2013 8712 0.0 0.0 0.0
2014 8490 0.0 0.0 0.0
2015 8550 0.0 0.0 0.0
2016 8696 0.0 0.0 0.0
2017 8417 0.0 0.0 0.0
2018 8729 0.0 0.0 0.0
2019 8698 0.0 0.0 0.0
2020 2161 0.0 0.0 0.0

For data sources see[5]

References