X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194162709000

Well Details

Well ID: 0194162709000
Loading map...
Location: 00/09-27-019-16W4/0
Location Alias: 00/09-27-19-16 W4M
Location Alias 2: 00/09-27-019-16 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 16
Section: 27
County/Municipality: County of Newell
Well Name: SUN COUNT 9-27-19-16
Operator Name: Suncor Energy Inc.
License Number: 0009765
License Date: 1955-07-19
License Status: RecCertified
Spud Date: 1955-07-20
Final Drill Date: 1955-08-05
Well Total Depth: 1120.10 m
Surface Hole Latitude: 50.639490
Surface Hole Longitude: -112.131161

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1955-07-19 Obtained License
1955-07-27 Drill Stem Test Performed
1955-07-28 Drill Stem Test Performed
1955-08-01 Drill Stem Test Performed
1955-08-02 Drill Stem Test Performed
1955-08-03 Drill Stem Test Performed
1955-08-05 Finished Drilling
1955-08-06 Production Casing Operation Performed
1955-08-07 Well Mode changed to Drilled and Cased
1959-11-16 Perforation Treatment Performed - Jet Perforation
1960-11-01 Well Began Production
1960-11-01 Well Fluid changed to Gas
1960-11-01 Well Mode changed to Flowing
1961-02-05 Perforation Treatment Performed - Condensate Squeeze
1963-10-29 Perforation Treatment Performed - Cement Squeeze
1963-11-02 Perforation Treatment Performed - Selective Jet Perforations
1963-11-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1963-12-11 Well Fluid changed to Gas
1963-12-11 Well Mode changed to Suspended
1964-07-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1964-07-08 Well Abandoned
1964-07-08 Well Fluid changed to Gas
1964-07-08 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-11-16 Perforation 848.60 851.00 13
1961-02-05 Condensate Squeeze 848.60 851.00 0
1963-10-29 Cement Squeeze 848.60 851.00 0
1963-11-02 Selective Jet Perforations 849.80 849.80 0
1963-11-15 Acid Treatment 849.80 849.80 0
1964-07-07 Packing Device Capped w/Cement 823.00 836.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References