X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194122616000

Well Details

Well ID: 0194122616000
Loading map...
Location: 00/16-26-019-12W4/0
Location Alias: 00/16-26-19-12 W4M
Location Alias 2: 00/16-26-019-12 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 12
Section: 26
County/Municipality: County of Newell
Well Name: TXNE PRIN 16-26-19-12
Operator Name: Torxen Energy Ltd.
License Number: 0054839
License Date: 1975-09-08
License Status: Abandoned
Spud Date: 1975-09-14
Final Drill Date: 1975-09-16
Well Total Depth: 493.80 m
Surface Hole Latitude: 50.644583
Surface Hole Longitude: -111.551468

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1975-09-08 Obtained License
1975-09-16 Finished Drilling
1975-09-16 Production Casing Operation Performed
1976-01-07 Perforation Treatment Performed - Jet Perforation
1976-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-08 Perforation Treatment Performed - Fractured
1976-01-10 Perforation Treatment Performed - Jet Perforation
1976-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-01-12 Perforation Treatment Performed - Fractured
1976-03-29 Well Mode changed to Drilled and Cased
1976-09-13 Well Began Production
1976-09-13 Well Fluid changed to Gas
1976-09-13 Well Mode changed to Flowing
2009-09-13 Well Log Performed
2009-12-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-12-22 Plug Back Performed
2009-12-22 Well Fluid changed to Gas
2009-12-22 Well Log Performed
2009-12-22 Well Mode changed to Abandoned Zone
2010-05-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-05-26 Plug Back Performed
2010-07-27 Well Abandoned
2010-07-27 Well Fluid changed to Gas
2010-07-27 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1976-01-07 Perforation 463.90 465.10 3
1976-01-12 Acid Treatment 362.10 401.40 0
1976-01-12 Fracture 362.10 401.40 0
2009-12-22 Packing Device Capped w/Cement 452.00 460.00 0
2009-12-22 Packing Device Capped w/Cement 351.00 359.00 0
2010-05-26 Packing Device Capped w/Cement 2.00 205.00 0
1976-01-07 Perforation 467.00 468.50 3
1976-01-07 Perforation 472.40 474.30 3
1976-01-08 Acid Treatment 463.90 474.30 0
1976-01-08 Fracture 463.90 474.30 0
1976-01-10 Perforation 362.10 363.30 3
1976-01-10 Perforation 371.20 372.50 3
1976-01-10 Perforation 387.40 388.90 3
1976-01-10 Perforation 400.20 401.40 3

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 2590 0.0 0.0 0.0
1977 6792 0.0 0.0 0.0
1978 6062 0.0 0.0 0.0
1979 6484 0.0 0.0 0.0
1980 5072 0.0 0.0 0.0
1981 5010 0.0 0.0 0.0
1982 4163 0.0 0.0 0.0
1983 1117 0.0 0.0 0.0
1984 2661 0.0 0.0 0.0
1985 2979 0.0 0.0 0.0
1986 6172 0.0 0.0 0.0
1987 6460 0.0 0.0 0.0
1988 8142 0.0 0.0 0.0
1989 1547 0.0 0.0 0.0
1990 408 0.0 0.0 0.0
1991 1022 0.0 0.0 0.0
1992 5122 0.0 0.0 0.0
1993 7904 0.0 0.0 0.0
1994 8316 0.0 0.0 0.0
1995 7817 0.0 0.0 0.0
1996 8640 0.0 0.0 0.0
1997 8628 0.0 0.0 0.0
1998 8711 0.0 0.0 0.0
1999 8627 0.0 0.0 0.0
2000 8690 0.0 0.0 0.0
2001 8572 0.0 0.0 0.0
2002 8415 0.0 0.0 0.0
2003 8668 0.0 0.0 0.0
2004 8776 0.0 0.0 0.0
2005 8759 0.0 0.0 0.0
2006 8740 0.0 0.0 0.0
2007 8746 0.0 0.0 0.0
2008 5855 0.0 0.0 0.0
2009 5855 0.0 0.0 0.0

For data sources see[5]

References