X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194093106002

Well Details

Well ID: 0194093106002
Loading map...
Location: 00/06-31-019-09W4/2
Location Alias: 00/06-31-19-09 W4M
Location Alias 2: 00/06-31-019-09 W4/02
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 09
Section: 31
County/Municipality: Cypress County
Well Name: IMAGINEA JENNER 6-31-19-9
Operator Name: Cor4 Oil Corp.
License Number: 0036081
License Date: 1969-03-26
License Status: Issued
Spud Date: 1969-04-16
Final Drill Date: 1969-04-20
Well Total Depth: 1086.00 m
Surface Hole Latitude: 50.649551
Surface Hole Longitude: -111.244144

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1969-03-26 Obtained License
1969-04-19 Drill Stem Test Performed
1969-04-20 Finished Drilling
1969-04-20 Well Mode changed to Drilled and Cased
1969-04-21 Drill Stem Test Performed
1969-04-21 Well Log Performed
1969-04-22 Production Casing Operation Performed
1969-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-04-28 Perforation Treatment Performed - Jet Perforation
1969-05-08 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-08 Perforation Treatment Performed - Jet Perforation
1969-05-09 Perforation Treatment Performed - Cement Squeeze
1969-05-10 Perforation Treatment Performed - Acid Squeeze - Press Used
1969-05-10 Perforation Treatment Performed - Jet Perforation
1969-05-14 Perforation Treatment Performed - Cement Squeeze
1969-05-14 Perforation Treatment Performed - Jet Perforation
1969-05-16 Perforation Treatment Performed - Jet Perforation
1969-05-20 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-03-14 Perforation Treatment Performed - Cement Squeeze
1976-03-16 Perforation Treatment Performed - Cement Squeeze
1976-03-18 Perforation Treatment Performed - Cement Squeeze
1976-03-20 Perforation Treatment Performed - Cement Squeeze
1976-03-26 Perforation Treatment Performed - Jet Perforation
1976-03-31 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-04-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1976-05-01 Perforation Treatment Performed - Acid Squeeze - Press Used
1976-05-01 Perforation Treatment Performed - Fractured
1976-05-01 Perforation Treatment Performed - Jet Perforation
1976-05-12 Well Began Production
1976-05-12 Well Fluid changed to Gas
1976-05-12 Well Mode changed to Flowing
1993-10-02 Perforation Treatment Performed - Jet Perforation
1993-10-15 Perforation Treatment Performed - Fractured
1993-10-17 Perforation Treatment Performed - Jet Perforation
1993-10-20 Perforation Treatment Performed - Fractured

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1969-04-28 Perforation 1048.80 1049.40 13
1969-05-16 Perforation 939.40 941.20 13
1969-05-20 Acid Treatment 939.40 941.20 0
1976-03-14 Cement Squeeze 939.40 941.20 0
1976-03-16 Cement Squeeze 939.40 941.20 0
1976-03-18 Cement Squeeze 939.40 941.20 0
1976-03-20 Cement Squeeze 939.40 941.20 0
1976-03-26 Perforation 1047.90 1048.50 3
1976-03-31 Acid Treatment 1047.90 1049.40 0
1976-04-02 Acid Treatment 1047.90 1049.40 0
1976-04-27 Packing Device Capped w/Cement 919.00 1033.30 0
1969-04-28 Acid Treatment 1048.80 1049.40 0
1976-05-01 Perforation 725.70 727.60 3
1976-05-01 Acid Treatment 725.70 727.60 0
1976-05-01 Fracture 725.70 727.60 0
1993-10-02 Perforation 535.80 536.50 13
1993-10-02 Perforation 538.20 539.50 13
1993-10-02 Perforation 541.00 541.90 13
1993-10-02 Perforation 543.80 545.00 13
1993-10-15 Fracture 535.80 545.00 0
1993-10-17 Perforation 423.60 424.90 13
1993-10-17 Perforation 427.60 428.20 13
1969-05-08 Perforation 964.40 966.80 13
1993-10-17 Perforation 436.40 437.70 13
1993-10-17 Perforation 443.80 445.00 13
1993-10-17 Perforation 450.80 451.70 13
1993-10-17 Perforation 453.50 454.70 13
1993-10-17 Perforation 456.00 456.60 13
1993-10-17 Perforation 459.30 460.50 13
1993-10-17 Perforation 471.20 472.40 13
1993-10-17 Perforation 473.60 474.90 13
1993-10-17 Perforation 481.60 482.80 13
1993-10-17 Perforation 485.20 486.10 13
1969-05-08 Acid Treatment 964.40 966.80 0
1993-10-20 Fracture 423.60 486.10 0
1969-05-09 Cement Squeeze 964.40 966.80 0
1969-05-10 Perforation 939.40 941.20 13
1969-05-10 Acid Treatment 939.40 941.20 0
1969-05-14 Perforation 945.50 945.80 13
1969-05-14 Cement Squeeze 945.50 945.80 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1976 5166 0.0 0.0 0.0
1977 5094 0.0 0.0 0.0
1978 3003 0.0 0.0 0.0
1979 2791 0.0 0.0 0.0
1980 4317 0.0 0.0 0.0
1981 3198 0.0 0.0 0.0
1982 3962 0.0 0.0 0.0
1983 3021 0.0 0.0 0.0
1984 737 0.0 0.0 0.0
1985 2821 0.0 0.0 0.0
1986 5149 0.0 0.0 0.0
1987 4720 0.0 0.0 0.0
1988 5433 0.0 0.0 0.0
1989 6287 0.0 0.0 0.0
1990 7867 0.0 0.0 0.0
1991 8437 0.0 0.0 0.0
1992 8168 0.0 0.0 0.0
1993 7732 0.0 0.0 0.0
1994 8090 0.0 0.0 0.0
1995 8399 0.0 0.0 0.0
1996 7987 0.0 0.0 0.0
1997 8713 0.0 0.0 0.0
1998 8723 0.0 0.0 0.0
1999 8701 0.0 0.0 0.0
2000 8703 0.0 0.0 0.0
2001 8648 0.0 0.0 0.0
2002 8750 0.0 0.0 0.0
2003 8671 0.0 0.0 0.0
2004 8684 0.0 0.0 0.0
2005 8694 0.0 0.0 0.0
2006 8700 0.0 0.0 0.0
2007 8725 0.0 0.0 0.0
2008 8783 0.0 0.0 0.0
2009 8759 0.0 0.0 0.0
2010 8756 0.0 0.0 0.0
2011 8759 0.0 0.0 0.0
2012 8783 0.0 0.0 0.0
2013 8759 0.0 0.0 0.0
2014 8759 0.0 0.0 0.0
2015 8759 0.0 0.0 0.0
2016 8783 0.0 0.0 0.0
2017 8728 0.0 0.0 0.0
2018 8759 0.0 0.0 0.0
2019 8759 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References