X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194083406020

Well Details

Well ID: 0194083406020
Loading map...
Location: 02/06-34-019-08W4/0
Location Alias: 02/06-34-19-08 W4M
Location Alias 2: 02/06-34-019-08 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 08
Section: 34
County/Municipality: Cypress County
Well Name: CVE SUFFIELD 6-34-19-8
Operator Name: Ipc Canada Ltd.
License Number: 0064832
License Date: 1977-07-18
License Status: Amended
Spud Date: 1977-07-25
Final Drill Date: 1977-07-29
Well Total Depth: 1001.30 m
Surface Hole Latitude: 50.651730
Surface Hole Longitude: -111.035488

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1977-07-18 Obtained License
1977-07-29 Finished Drilling
1977-07-29 Well Mode changed to Drilled and Cased
1977-07-30 Drill Stem Test Performed
1977-08-01 Production Casing Operation Performed
1977-08-25 Perforation Treatment Performed - Jet Perforation
1977-08-26 Well Began Production
1977-08-26 Well Fluid changed to Crude Oil
1977-08-26 Well Mode changed to Flowing
1978-01-28 Well Fluid changed to Crude Oil
1978-01-28 Well Mode changed to Pumping
1979-01-08 Perforation Treatment Performed - Jet Perforation
1979-01-09 Perforation Treatment Performed - Cement Squeeze
1979-01-18 Perforation Treatment Performed - Jet Perforation
1979-01-19 Perforation Treatment Performed - Cement Squeeze
1979-01-20 Perforation Treatment Performed - Jet Perforation
1979-01-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-01-21 Perforation Treatment Performed - Cement Squeeze
1979-01-24 Perforation Treatment Performed - Jet Perforation
1996-06-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-06-27 Plug Back Performed
1996-06-27 Well Fluid changed to Crude Oil
1996-06-27 Well Mode changed to Abandoned and Whipstocked

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1977-08-25 Perforation 926.60 929.60 13
1996-06-27 Packing Device Capped w/Cement 909.00 917.00 0
1979-01-08 Perforation 941.80 943.00 13
1979-01-09 Cement Squeeze 941.80 943.00 0
1979-01-18 Perforation 941.80 944.30 13
1979-01-19 Cement Squeeze 941.80 944.30 0
1979-01-20 Perforation 935.40 936.30 13
1979-01-21 Acid Treatment 935.40 936.30 0
1979-01-21 Cement Squeeze 935.40 936.30 0
1979-01-24 Perforation 921.70 925.40 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1977 2280 0.0 0.0 0.0
1978 5774 0.0 0.0 0.0
1979 4660 0.0 0.0 0.0
1980 8767 0.0 0.0 0.0
1981 8604 0.0 0.0 0.0
1982 6216 0.0 0.0 0.0
1983 8759 0.0 0.0 0.0
1984 8783 0.0 0.0 0.0
1985 8015 0.0 0.0 0.0
1986 6848 0.0 0.0 0.0
1987 1730 0.0 0.0 0.0
1988 2075 0.0 0.0 0.0
1991 231 0.0 0.0 0.0

For data sources see[5]

References