X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0194082711000

Well Details

Well ID: 0194082711000
Loading map...
Location: 00/11-27-019-08W4/0
Location Alias: 00/11-27-19-08 W4M
Location Alias 2: 00/11-27-019-08 W4/00
Country: Canada
Province: Alberta
Township: 019
Meridian: 4
Range: 08
Section: 27
County/Municipality: Cypress County
Well Name: CVE 2A-27 SUFFIELD 11-27-19-8
Operator Name: Cenovus Energy Inc.
License Number: 0199705
License Date: 1997-03-24
License Status: RecExempt
Spud Date: 1997-05-27
Final Drill Date: 1997-06-04
Well Total Depth: 1434.00 m
Surface Hole Latitude: 50.632993
Surface Hole Longitude: -111.030805

For data sources see[1][2]

Well History

Date Event
1997-03-24 Obtained License
1997-05-28 Surface Casing Operation Performed
1997-05-29 Direction Drilling Operation Performed - Horizontal
1997-05-29 Well Log Performed
1997-06-03 Production Casing Operation Performed
1997-06-04 Finished Drilling
1997-06-04 Perforation Treatment Performed - Open-Hole Completion
1997-06-04 Well Log Performed
1997-06-04 Well Mode changed to Drilled and Cased
1997-06-05 Rig Released
1997-06-20 Well Log Performed
1997-07-02 Well Began Production
1997-07-02 Well Fluid changed to Crude Oil
1997-07-02 Well Mode changed to Pumping
1997-11-17 Well Log Performed
2004-05-01 Well Fluid changed to Crude Oil
2004-05-01 Well Mode changed to Suspended
2010-08-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-08-28 Plug Back Performed
2010-08-28 Well Fluid changed to Crude Oil
2010-08-28 Well Mode changed to Abandoned Zone
2010-10-22 Well Abandoned
2010-10-22 Well Fluid changed to Crude Oil
2010-10-22 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-05-29 757.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-06-04 Open Hole/Barefoot Completion 1046.00 1434.00 0
2010-08-28 Packing Device Capped w/Cement 580.00 889.80 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 3446 0.0 0.0 0.0
1998 6291 0.0 0.0 0.0
1999 8592 0.0 0.0 0.0
2000 6472 0.0 0.0 0.0
2001 7926 0.0 0.0 0.0
2002 1152 0.0 0.0 0.0

For data sources see[6]

References