X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185022911000

Well Details

Well ID: 0185022911000
Loading map...
Location: 00/11-29-018-02W5/0
Location Alias: 00/11-29-18-02 W5M
Location Alias 2: 00/11-29-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 29
County/Municipality: Foothills County
Well Name: CPEC COMMAND 2 TV 11-29-18-2
Operator Name: Crescent Point Energy Corp.
License Number: B0000048
License Date: 1939-06-17
License Status: Abandoned
Spud Date: 1939-07-09
Final Drill Date: 1939-12-29
Well Total Depth: 2494.50 m
Surface Hole Latitude: 50.552597
Surface Hole Longitude: -114.245210

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1939-06-17 Obtained License
1939-12-11 Production Casing Operation Performed
1939-12-29 Finished Drilling
1939-12-29 Perforation Treatment Performed - Open-Hole Completion
1939-12-29 Well Mode changed to Drilled and Cased
1939-12-31 Perforation Treatment Performed - Acid Wash - No Pressure
1939-12-31 Well Began Production
1939-12-31 Well Fluid changed to Crude Oil
1939-12-31 Well Mode changed to Flowing
1940-01-02 Perforation Treatment Performed - Acid Wash - No Pressure
1952-08-12 Well Fluid changed to Crude Oil
1952-08-12 Well Mode changed to Pumping
1960-12-13 Well Began Injection
1960-12-13 Well Fluid changed to Water
1960-12-13 Well Type changed to Injection
2011-10-01 Well Fluid changed to Water
2011-10-01 Well Mode changed to Suspended
2011-10-01 Well Type changed to Injection
2017-02-10 Well Log Performed
2017-02-11 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-02-11 Plug Back Performed
2017-02-11 Well Fluid changed to Water
2017-02-11 Well Log Performed
2017-02-11 Well Mode changed to Abandoned Zone
2017-02-11 Well Type changed to Injection
2017-02-13 Perforation Treatment Performed - Jet Perforation
2017-02-13 Well Log Performed
2017-02-14 Perforation Treatment Performed - Cement Plug
2017-02-14 Perforation Treatment Performed - Cement Squeeze
2017-02-14 Plug Back Performed
2017-02-15 Perforation Treatment Performed - Jet Perforation
2017-02-15 Well Log Performed
2017-02-17 Perforation Treatment Performed - Jet Perforation
2017-02-17 Well Log Performed
2017-02-21 Well Log Performed
2017-02-22 Perforation Treatment Performed - Cement Plug
2017-02-22 Perforation Treatment Performed - Cement Squeeze
2017-02-22 Plug Back Performed
2017-02-23 Perforation Treatment Performed - Jet Perforation
2017-02-23 Well Log Performed
2017-02-24 Perforation Treatment Performed - Cement Plug
2017-02-24 Perforation Treatment Performed - Cement Squeeze
2017-02-24 Plug Back Performed
2017-02-25 Perforation Treatment Performed - Jet Perforation
2017-02-25 Well Log Performed
2017-02-27 Perforation Treatment Performed - Cement Plug
2017-02-27 Perforation Treatment Performed - Cement Squeeze
2017-02-27 Plug Back Performed
2017-02-27 Well Log Performed
2017-03-01 Perforation Treatment Performed - Jet Perforation
2017-03-01 Well Log Performed
2017-03-03 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-03-03 Perforation Treatment Performed - Jet Perforation
2017-03-03 Plug Back Performed
2017-03-03 Well Log Performed
2017-03-30 Well Log Performed
2017-03-31 Perforation Treatment Performed - Cement Plug
2017-03-31 Perforation Treatment Performed - Cement Squeeze
2017-03-31 Plug Back Performed
2017-04-03 Perforation Treatment Performed - Jet Perforation
2017-04-03 Well Log Performed
2017-04-04 Perforation Treatment Performed - Cement Plug
2017-04-04 Perforation Treatment Performed - Cement Squeeze
2017-04-04 Plug Back Performed
2017-04-04 Well Log Performed
2017-04-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-04-05 Perforation Treatment Performed - Jet Perforation
2017-04-05 Plug Back Performed
2017-04-05 Well Log Performed
2017-04-06 Perforation Treatment Performed - Cement Plug
2017-04-06 Perforation Treatment Performed - Cement Squeeze
2017-04-06 Plug Back Performed
2017-04-07 Perforation Treatment Performed - Cement Plug
2017-04-07 Perforation Treatment Performed - Cement Squeeze
2017-04-07 Perforation Treatment Performed - Jet Perforation
2017-04-07 Plug Back Performed
2017-04-07 Well Log Performed
2017-05-03 Well Abandoned
2017-05-03 Well Fluid changed to Water
2017-05-03 Well Mode changed to Abandoned
2017-05-03 Well Type changed to Injection

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-12-29 Open Hole/Barefoot Completion 2349.70 2494.50 0
2017-02-22 Cement Squeeze 2046.00 2047.00 0
2017-02-22 Cement Squeeze 2035.00 2036.00 0
2017-02-22 Cement Plug 2018.70 2029.70 0
2017-02-23 Perforation 1980.00 1981.00 17
2017-02-23 Perforation 1970.00 1971.00 17
2017-02-24 Cement Squeeze 1980.00 1981.00 0
2017-02-24 Cement Plug 1963.70 1974.70 0
2017-02-25 Perforation 1950.00 1951.00 17
2017-02-27 Cement Squeeze 1950.00 1951.00 0
2017-02-27 Cement Plug 1937.10 1946.70 0
1939-12-31 Acid Wash 2414.00 2490.20 0
2017-03-01 Perforation 1922.50 1923.50 17
2017-03-03 Packing Device Capped w/Cement 1910.70 1918.70 0
2017-03-03 Perforation 1792.00 1793.00 17
2017-03-31 Cement Squeeze 1792.00 1793.00 0
2017-03-31 Cement Plug 1780.70 1789.70 0
2017-04-03 Perforation 1756.00 1757.00 17
2017-04-04 Cement Squeeze 1756.00 1757.00 0
2017-04-04 Cement Plug 1745.70 1753.70 0
2017-04-05 Perforation 1391.00 1392.00 17
2017-04-05 Packing Device Capped w/Cement 1379.70 1387.70 0
1940-01-02 Acid Wash 2414.00 2490.20 0
2017-04-05 Perforation 803.00 804.00 17
2017-04-06 Cement Squeeze 803.00 804.00 0
2017-04-06 Cement Plug 788.70 799.70 0
2017-04-07 Perforation 351.00 352.00 17
2017-04-07 Cement Squeeze 351.00 352.00 0
2017-04-07 Cement Plug 336.70 347.70 0
2017-02-11 Packing Device Capped w/Cement 2334.70 2342.70 0
2017-02-13 Perforation 2072.00 2073.00 17
2017-02-14 Cement Squeeze 2072.00 2073.00 0
2017-02-14 Cement Plug 2055.60 2068.70 0
2017-02-15 Perforation 2046.00 2047.00 17
2017-02-17 Perforation 2035.00 2036.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1968 0 0.0 0.0 0.0
1969 0 0.0 0.0 0.0
1970 0 0.0 0.0 0.0
1971 0 0.0 0.0 0.0
1972 0 0.0 0.0 0.0
1973 0 0.0 0.0 0.0
1974 0 0.0 0.0 0.0
1975 0 0.0 0.0 0.0
1976 0 0.0 0.0 0.0
1977 0 0.0 0.0 0.0
1978 0 0.0 0.0 0.0
1979 0 0.0 0.0 0.0
1981 0 0.0 0.0 0.0
1982 0 0.0 0.0 0.0
1983 0 0.0 0.0 0.0
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1992 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-03-28 No Incident Encountered 0.00 0.00
2017-04-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References