X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185022910000

Well Details

Well ID: 0185022910000
Loading map...
Location: 00/10-29-018-02W5/0
Location Alias: 00/10-29-18-02 W5M
Location Alias 2: 00/10-29-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 29
County/Municipality: Foothills County
Well Name: CPEC COMMOIL NO.2 TV 10-29-18-2
Operator Name: Crescent Point Energy Corp.
License Number: A0000175
License Date: 1938-03-29
License Status: Suspension
Spud Date: 1938-04-10
Final Drill Date: 1938-08-29
Well Total Depth: 2336.30 m
Surface Hole Latitude: 50.551501
Surface Hole Longitude: -114.241152

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1938-03-29 Obtained License
1938-08-12 Production Casing Operation Performed
1938-08-29 Finished Drilling
1938-08-29 Perforation Treatment Performed - Open-Hole Completion
1938-08-29 Well Mode changed to Drilled and Cased
1938-08-30 Well Began Production
1938-08-30 Well Fluid changed to Crude Oil
1938-08-30 Well Mode changed to Flowing
1938-08-31 Perforation Treatment Performed - Acid Wash - No Pressure
1938-09-05 Perforation Treatment Performed - Acid Wash - No Pressure
1938-10-10 Perforation Treatment Performed - Acid Wash - No Pressure
1961-04-14 Well Fluid changed to Crude Oil
1961-04-14 Well Mode changed to Pumping
1965-12-12 Well Fluid changed to Crude Oil
1965-12-12 Well Mode changed to Gas Lift
1969-03-07 Well Fluid changed to Crude Oil
1969-03-07 Well Mode changed to Pumping
1998-07-04 Well Log Performed
1998-07-17 Well Log Performed
1999-03-02 Perforation Treatment Performed - Jet Perforation
2004-04-01 Perforation Treatment Performed - Jet Perforation
2004-04-01 Well Log Performed
2019-01-01 Well Fluid changed to Crude Oil
2019-01-01 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1938-08-29 Open Hole/Barefoot Completion 2195.80 2336.30 0
2004-04-01 Perforation 2203.70 2207.70 20
1938-08-31 Acid Wash 2195.80 2336.30 0
1938-09-05 Acid Wash 2195.80 2336.30 0
1938-10-10 Acid Wash 2195.80 2336.30 0
1999-03-02 Perforation 2241.00 2243.00 13
1999-03-02 Perforation 2257.70 2262.50 13
1999-03-02 Perforation 2286.00 2288.00 13
2004-04-01 Perforation 2220.80 2223.80 20
2004-04-01 Perforation 2207.70 2211.00 20

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 697 0.0 0.0 0.0
1968 1060 0.0 0.0 0.0
1969 6210 0.0 0.0 0.0
1970 7930 0.0 0.0 0.0
1971 2781 0.0 0.0 0.0
1972 4686 0.0 0.0 0.0
1973 7676 0.0 0.0 0.0
1974 5295 0.0 0.0 0.0
1975 6942 0.0 0.0 0.0
1976 8458 0.0 0.0 0.0
1977 8606 0.0 0.0 0.0
1978 7995 0.0 0.0 0.0
1979 7253 0.0 0.0 0.0
1980 8222 0.0 0.0 0.0
1981 8605 0.0 0.0 0.0
1982 7717 0.0 0.0 0.0
1983 8422 0.0 0.0 0.0
1984 8434 0.0 0.0 0.0
1985 7573 0.0 0.0 0.0
1986 8096 0.0 0.0 0.0
1987 7712 0.0 0.0 0.0
1988 7719 0.0 0.0 0.0
1989 8101 0.0 0.0 0.0
1990 8198 0.0 0.0 0.0
1991 8492 0.0 0.0 0.0
1992 8207 0.0 0.0 0.0
1993 8091 0.0 0.0 0.0
1994 7558 0.0 0.0 0.0
1995 8076 0.0 0.0 0.0
1996 7221 0.0 0.0 0.0
1997 8536 0.0 0.0 0.0
1998 4611 0.0 0.0 0.0
1999 8334 0.0 0.0 0.0
2000 8143 0.0 0.0 0.0
2001 6793 0.0 0.0 0.0
2002 6951 0.0 0.0 0.0
2003 7864 0.0 0.0 0.0
2004 6611 0.0 0.0 0.0
2005 6156 0.0 0.0 0.0
2006 7360 0.0 0.0 0.0
2007 7771 0.0 0.0 0.0
2008 8284 0.0 0.0 0.0
2009 6469 0.0 0.0 0.0
2010 8390 0.0 0.0 0.0
2011 8280 0.0 0.0 0.0
2012 5079 0.0 0.0 0.0
2013 5506 0.0 0.0 0.0
2014 6736 0.0 0.0 0.0
2015 1464 0.0 0.0 0.0
2016 332 0.0 0.0 0.0
2017 120 0.0 0.0 0.0

For data sources see[5]

References