X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185022902020

Well Details

Well ID: 0185022902020
Loading map...
Location: 02/02-29-018-02W5/0
Location Alias: 02/02-29-18-02 W5M
Location Alias 2: 02/02-29-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 29
County/Municipality: Foothills County
Well Name: CPEC 102 TV 2-29-18-2
Operator Name: Crescent Point Energy Corp.
License Number: 0425605
License Date: 2010-11-08
License Status: Issued
Spud Date: 2010-11-12
Final Drill Date: 2010-12-04
Well Total Depth: 2399.00 m
Surface Hole Latitude: 50.544941
Surface Hole Longitude: -114.244647

For data sources see[1][2]

Well History

Date Event
2010-11-08 Obtained License
2010-11-12 Well Log Performed
2010-11-14 Surface Casing Operation Performed
2010-11-15 Direction Drilling Operation Performed - Deviate
2010-12-04 Finished Drilling
2010-12-04 Well Mode changed to Drilled and Cased
2010-12-05 Well Log Performed
2010-12-06 Production Casing Operation Performed
2010-12-07 Rig Released
2010-12-18 Perforation Treatment Performed - Jet Perforation
2010-12-19 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-21 Perforation Treatment Performed - Jet Perforation
2010-12-22 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-12-27 Perforation Treatment Performed - Jet Perforation
2010-12-28 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-02 Perforation Treatment Performed - Fractured
2011-01-06 Perforation Treatment Performed - Jet Perforation
2011-01-08 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-10 Perforation Treatment Performed - Jet Perforation
2011-01-11 Perforation Treatment Performed - Jet Perforation
2011-01-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2011-01-20 Perforation Treatment Performed - Fractured
2011-01-25 Perforation Treatment Performed - Jet Perforation
2011-01-26 Perforation Treatment Performed - Fractured
2011-02-12 Well Began Production
2011-02-12 Well Fluid changed to Crude Oil
2011-02-12 Well Mode changed to Pumping

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-11-15 1226.10 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-12-18 Perforation 2384.00 2388.00 20
2011-01-10 Perforation 2275.50 2277.50 20
2011-01-11 Perforation 2268.00 2270.00 20
2011-01-12 Acid Treatment 2268.00 2277.50 0
2011-01-20 Fracture 2268.00 2277.50 0
2011-01-25 Perforation 2254.00 2256.00 20
2011-01-26 Fracture 2254.00 2256.00 0
2010-12-19 Acid Treatment 2384.00 2388.00 0
2010-12-21 Perforation 2367.00 2369.00 20
2010-12-22 Acid Treatment 2367.00 2369.00 0
2010-12-27 Perforation 2312.50 2315.50 20
2010-12-28 Acid Treatment 2312.50 2315.50 0
2011-01-02 Fracture 2312.50 2315.50 0
2011-01-06 Perforation 2281.00 2284.00 20
2011-01-08 Acid Treatment 2281.00 2284.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 7163 0.0 0.0 0.0
2012 8776 0.0 0.0 0.0
2013 8413 0.0 0.0 0.0
2014 8599 0.0 0.0 0.0
2015 8250 0.0 0.0 0.0
2016 8635 0.0 0.0 0.0
2017 8741 0.0 0.0 0.0
2018 8695 0.0 0.0 0.0
2019 8512 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[6]

References