X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185022013002

Well Details

Well ID: 0185022013002
Loading map...
Location: 00/13-20-018-02W5/2
Location Alias: 00/13-20-18-02 W5M
Location Alias 2: 00/13-20-018-02 W5/02
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 20
County/Municipality: Foothills County
Well Name: CPEC MARTIN #1 DD TV 13-20-18-2
Operator Name: Crescent Point Energy Corp.
License Number: 0309803
License Date: 2004-06-07
License Status: Amended
Spud Date: 2004-06-19
Final Drill Date: 2004-08-08
Well Total Depth: 3471.00 m
Surface Hole Latitude: 50.532369
Surface Hole Longitude: -114.249954

For data sources see[1][2]

Well History

Date Event
2004-06-07 Obtained License
2004-06-24 Surface Casing Operation Performed
2004-07-05 Direction Drilling Operation Performed - Horizontal
2004-07-13 Well Log Performed
2004-07-15 Intermediate Casing Operation Performed
2004-07-29 Direction Drilling Operation Performed - Horizontal
2004-08-08 Finished Drilling
2004-08-08 Perforation Treatment Performed - Open-Hole Completion
2004-08-08 Well Log Performed
2004-08-08 Well Structure changed to Drain
2004-08-17 Well Log Performed
2004-08-19 Well Log Performed
2004-08-21 Rig Released
2004-09-10 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-04-04 Perforation Treatment Performed - Jet Perforation
2010-04-07 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2004-07-05 2258.10 Horizontal
2004-07-29 2785.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2004-08-08 Open Hole/Barefoot Completion 2684.00 3471.00 0
2004-09-10 Acid Treatment 2830.00 3471.00 0
2010-04-04 Perforation 2659.00 2662.00 17
2010-04-04 Perforation 2652.00 2655.00 17
2010-04-04 Perforation 2634.00 2637.00 17
2010-04-07 Acid Treatment 2659.00 2662.00 0
2010-04-07 Acid Treatment 2652.00 2655.00 0
2010-04-07 Acid Treatment 2634.00 2637.00 0

For data sources see[5]



References