X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185022011000

Well Details

Well ID: 0185022011000
Loading map...
Location: 00/11-20-018-02W5/0
Location Alias: 00/11-20-18-02 W5M
Location Alias 2: 00/11-20-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 20
County/Municipality: Foothills County
Well Name: CPEC INTER-CITY ROY 1 TV 11-20-18-2
Operator Name: Crescent Point Energy Corp.
License Number: A0000163
License Date: 1938-02-05
License Status: Issued
Spud Date: 1938-01-29
Final Drill Date: 1938-12-08
Well Total Depth: 2452.10 m
Surface Hole Latitude: 50.536485
Surface Hole Longitude: -114.244805

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1938-02-05 Obtained License
1938-11-21 Production Casing Operation Performed
1938-12-08 Finished Drilling
1938-12-08 Perforation Treatment Performed - Open-Hole Completion
1938-12-08 Well Mode changed to Drilled and Cased
1938-12-09 Well Began Production
1938-12-09 Well Fluid changed to Crude Oil
1938-12-09 Well Mode changed to Flowing
1939-03-20 Perforation Treatment Performed - Acid Wash - No Pressure
1939-04-05 Perforation Treatment Performed - Bullet Perforation
1939-05-03 Perforation Treatment Performed - Acid Wash - No Pressure
1939-08-07 Perforation Treatment Performed - Open-Hole Completion
1939-08-07 Well Fluid changed to Crude Oil
1939-08-07 Well Mode changed to Gas Lift
1940-02-05 Perforation Treatment Performed - Acid Wash - No Pressure
1940-02-17 Perforation Treatment Performed - Acid Wash - No Pressure
1941-01-06 Perforation Treatment Performed - Acid Wash - No Pressure
1968-12-07 Well Fluid changed to Crude Oil
1968-12-07 Well Mode changed to Pumping
1996-10-16 Well Log Performed
1996-10-17 Well Log Performed
1998-07-01 Well Began Injection
1998-07-01 Well Fluid changed to Water
1998-07-01 Well Type changed to Injection
2004-07-09 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1938-12-08 Open Hole/Barefoot Completion 2307.60 2452.10 0
1939-03-20 Acid Wash 2307.60 2452.10 0
1939-04-05 Bullet Perforation 2362.20 2375.90 10
1939-05-03 Acid Wash 2307.60 2393.00 0
1939-08-07 Open Hole/Barefoot Completion 2307.60 2447.50 0
1940-02-05 Acid Wash 2307.60 2447.50 0
1940-02-17 Acid Wash 2307.60 2447.50 0
1941-01-06 Acid Wash 2307.60 2447.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 720 0.0 0.0 0.0
1968 3468 0.0 0.0 0.0
1969 8474 0.0 0.0 0.0
1970 8446 0.0 0.0 0.0
1971 8423 0.0 0.0 0.0
1972 8742 0.0 0.0 0.0
1973 8601 0.0 0.0 0.0
1974 8679 0.0 0.0 0.0
1975 6370 0.0 0.0 0.0
1976 6503 0.0 0.0 0.0
1977 6267 0.0 0.0 0.0
1978 8160 0.0 0.0 0.0
1979 6107 0.0 0.0 0.0
1980 5898 0.0 0.0 0.0
1981 5333 0.0 0.0 0.0
1982 4219 0.0 0.0 0.0
1983 4417 0.0 0.0 0.0
1984 8261 0.0 0.0 0.0
1985 6317 0.0 0.0 0.0
1986 6907 0.0 0.0 0.0
1987 5822 0.0 0.0 0.0
1988 7744 0.0 0.0 0.0
1989 8319 0.0 0.0 0.0
1990 8063 0.0 0.0 0.0
1991 8371 0.0 0.0 0.0
1992 8509 0.0 0.0 0.0
1993 8279 0.0 0.0 0.0
1994 8268 0.0 0.0 0.0
1995 7828 0.0 0.0 0.0
1996 6042 0.0 0.0 0.0
1997 48 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0
2019 0 0.0 0.0 0.0
2020 0 0.0 0.0 0.0

For data sources see[5]

References