X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185021715000

Well Details

Well ID: 0185021715000
Loading map...
Location: 00/15-17-018-02W5/0
Location Alias: 00/15-17-18-02 W5M
Location Alias 2: 00/15-17-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 17
County/Municipality: Longview
Well Name: CPEC CORONATION 1 TV 15-17-18-2
Operator Name: Crescent Point Energy Corp.
License Number: A0000148
License Date: 1937-11-24
License Status: Issued
Spud Date: 1938-01-04
Final Drill Date: 1938-06-27
Well Total Depth: 2307.90 m
Surface Hole Latitude: 50.527357
Surface Hole Longitude: -114.238134

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1937-11-24 Obtained License
1938-06-01 Production Casing Operation Performed
1938-06-27 Finished Drilling
1938-06-27 Perforation Treatment Performed - Open-Hole Completion
1938-06-27 Well Mode changed to Drilled and Cased
1938-07-01 Well Began Production
1938-07-01 Well Fluid changed to Crude Oil
1938-07-01 Well Mode changed to Flowing
1938-07-04 Perforation Treatment Performed - Acid Wash - No Pressure
1938-07-18 Perforation Treatment Performed - Acid Wash - No Pressure
1961-08-21 Well Began Injection
1961-08-21 Well Fluid changed to Gas
1961-08-21 Well Type changed to Injection
1969-08-15 Well Fluid changed to Gas
1969-08-15 Well Mode changed to Suspended
1969-08-15 Well Type changed to Injection
1970-01-01 Well Fluid changed to Crude Oil
1970-01-01 Well Mode changed to Flowing
1970-08-12 Well Fluid changed to Crude Oil
1970-08-12 Well Mode changed to Pumping
2003-08-10 Well Log Performed
2003-08-12 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-10-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2010-08-10 Perforation Treatment Performed - Chemical Squeeze

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1938-06-27 Open Hole/Barefoot Completion 2169.30 2307.90 0
1938-07-04 Acid Wash 2169.30 2307.90 0
1938-07-18 Acid Wash 2169.30 2307.90 0
2003-08-12 Acid Treatment 2169.30 2307.90 0
2003-10-24 Acid Treatment 2178.00 2250.00 0
2010-08-10 Chemical Squeeze 2169.30 2245.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 0 0.0 0.0 0.0
1970 6661 0.0 0.0 0.0
1971 8737 0.0 0.0 0.0
1972 7219 0.0 0.0 0.0
1973 6864 0.0 0.0 0.0
1974 8372 0.0 0.0 0.0
1975 6094 0.0 0.0 0.0
1976 6908 0.0 0.0 0.0
1977 6286 0.0 0.0 0.0
1978 8699 0.0 0.0 0.0
1979 8622 0.0 0.0 0.0
1980 8667 0.0 0.0 0.0
1981 8623 0.0 0.0 0.0
1982 8667 0.0 0.0 0.0
1983 8574 0.0 0.0 0.0
1984 7250 0.0 0.0 0.0
1985 7737 0.0 0.0 0.0
1986 8263 0.0 0.0 0.0
1987 8604 0.0 0.0 0.0
1988 8738 0.0 0.0 0.0
1989 8545 0.0 0.0 0.0
1990 8539 0.0 0.0 0.0
1991 8525 0.0 0.0 0.0
1992 8601 0.0 0.0 0.0
1993 8067 0.0 0.0 0.0
1994 8531 0.0 0.0 0.0
1995 8222 0.0 0.0 0.0
1996 8514 0.0 0.0 0.0
1997 8317 0.0 0.0 0.0
1998 8538 0.0 0.0 0.0
1999 8619 0.0 0.0 0.0
2000 8604 0.0 0.0 0.0
2001 8296 0.0 0.0 0.0
2002 8426 0.0 0.0 0.0
2003 8222 0.0 0.0 0.0
2004 8233 0.0 0.0 0.0
2005 7710 0.0 0.0 0.0
2006 8543 0.0 0.0 0.0
2007 8504 0.0 0.0 0.0
2008 8632 0.0 0.0 0.0
2009 8006 0.0 0.0 0.0
2010 8415 0.0 0.0 0.0
2011 8506 0.0 0.0 0.0
2012 8472 0.0 0.0 0.0
2013 8626 0.0 0.0 0.0
2014 8694 0.0 0.0 0.0
2015 8428 0.0 0.0 0.0
2016 8697 0.0 0.0 0.0
2017 8192 0.0 0.0 0.0
2018 8718 0.0 0.0 0.0
2019 7916 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References