X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0185021603000

Well Details

Well ID: 0185021603000
Loading map...
Location: 00/03-16-018-02W5/0
Location Alias: 00/03-16-18-02 W5M
Location Alias 2: 00/03-16-018-02 W5/00
Country: Canada
Province: Alberta
Township: 018
Meridian: 5
Range: 02
Section: 16
County/Municipality: Foothills County
Well Name: OKALTA NO. 7
Operator Name: Canadian Natural Resources Limited
License Number: A0000152
License Date: 1937-12-07
License Status: RecExempt
Spud Date: 1938-01-23
Final Drill Date: 1939-11-19
Well Total Depth: 2605.40 m
Surface Hole Latitude: 50.514702
Surface Hole Longitude: -114.220796

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1937-12-07 Obtained License
1939-11-10 Production Casing Operation Performed
1939-11-19 Finished Drilling
1939-11-19 Perforation Treatment Performed - Open-Hole Completion
1939-11-19 Well Mode changed to Drilled and Cased
1939-11-20 Well Began Production
1939-11-20 Well Fluid changed to Crude Oil
1939-11-20 Well Mode changed to Flowing
1939-11-22 Perforation Treatment Performed - Acid Wash - No Pressure
1939-11-23 Perforation Treatment Performed - Acid Wash - No Pressure
1939-11-24 Perforation Treatment Performed - Acid Wash - No Pressure
1939-11-27 Perforation Treatment Performed - Acid Wash - No Pressure
1939-11-29 Perforation Treatment Performed - Bullet Perforation
1939-12-01 Perforation Treatment Performed - Acid Wash - No Pressure
1939-12-02 Perforation Treatment Performed - Acid Wash - No Pressure
1944-10-26 Perforation Treatment Performed - Open-Hole Completion
1944-12-26 Perforation Treatment Performed - Cement Plug
1944-12-26 Well Abandoned
1944-12-26 Well Fluid changed to Crude Oil
1944-12-26 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1939-11-19 Open Hole/Barefoot Completion 2228.10 2263.10 0
1944-12-26 Cement Plug 2069.60 2261.60 0
1939-11-22 Acid Wash 2228.10 2263.10 0
1939-11-23 Acid Wash 2228.10 2263.10 0
1939-11-24 Acid Wash 2228.10 2263.10 0
1939-11-27 Acid Wash 2228.10 2263.10 0
1939-11-29 Bullet Perforation 2159.50 2190.00 10
1939-12-01 Acid Wash 2159.50 2263.10 0
1939-12-02 Acid Wash 2159.50 2263.10 0
1944-10-26 Open Hole/Barefoot Completion 2263.10 2605.40 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0

For data sources see[5]

References